True North Solar, LLC
Solar power plant · Falls County, Texas
Nameplate capacity
239 MW
Rank in Texas
#244
of 1,071 plants
In service since
2024
December 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Avangrid Power LLC
- County
- Falls County
- Generating units
- 1
- Share of state capacity
- 0.12%
- Rank among solar plants in Texas
- #57 of 238
- EIA plant code
- 65998
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| TNS1 | Solar Photovoltaic | 239 MW | 240 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| West Raymond Wind Farm LLC | Wind | 240 MW |
| Blackjack Creek Wind Farm | Wind | 240 MW |
| Monte Cristo 1 | Wind | 239 MW |
| Rio Bravo Windpower, LLC | Wind | 238 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 239 MW solar plant and a 239 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates