Nameplate capacity
150 MW
Rank in Texas
#442
of 1,071 plants
In service since
2023
October 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Umbriel Solar, LLC
- County
- Polk County
- Generating units
- 1
- Share of state capacity
- 0.07%
- Rank among solar plants in Texas
- #105 of 238
- EIA plant code
- 66954
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 23001 | Solar Photovoltaic | 150 MW | 150 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Route 66 Wind Plant | Wind | 150 MW |
| Senate Wind LLC | Wind | 150 MW |
| Upton County Solar | Solar | 150 MW |
| Wildcat Ranch Wind Project | Wind | 150 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 150 MW solar plant and a 150 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates