Pitts Dudik Solar
Solar power plant · Hill County, Texas
Nameplate capacity
50 MW
Rank in Texas
#632
of 1,071 plants
In service since
2023
November 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Elawan Pitts Dudik Solar, LLC
- County
- Hill County
- Generating units
- 1
- Share of state capacity
- 0.02%
- Rank among solar plants in Texas
- #155 of 238
- EIA plant code
- 67024
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PTSDK | Solar Photovoltaic | 50 MW | 50 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Tortolas | Battery storage | 50 MW |
| Woodville Renewable Power Project | Other | 50 MW |
| Sunray Wind I | Wind | 50 MW |
| USG Paper, LLC - Orange Mill | Other | 48 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates