Home / Power plants / Texas / Pitts Dudik Solar

Pitts Dudik Solar

Solar power plant · Hill County, Texas

Nameplate capacity
50 MW
Rank in Texas
#632
of 1,071 plants
In service since
2023
November 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Elawan Pitts Dudik Solar, LLC
County
Hill County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Texas
#155 of 238
EIA plant code
67024

Generating units

Individual generating units at Pitts Dudik Solar
UnitTechnologyNameplateSummerOnlineStatus
PTSDKSolar Photovoltaic50 MW50 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates