Home / Power plants / Texas / Las Majadas Wind Farm

Las Majadas Wind Farm

Wind power plant · Willacy County, Texas

Nameplate capacity
273 MW
Rank in Texas
#196
of 1,071 plants
In service since
2021
March 2021

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Las Majadas Wind Farm, LLC
County
Willacy County
Generating units
1
Share of state capacity
0.14%
Rank among wind plants in Texas
#41 of 228
EIA plant code
63739

Generating units

Individual generating units at Las Majadas Wind Farm
UnitTechnologyNameplateSummerOnlineStatus
LMAJOnshore Wind Turbine273 MW273 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Bethel Wind Farm LLCWind276 MW
Shell Deer ParkNatural gas274 MW
Helena WindWind268 MW
Paris Energy CenterNatural gas266 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 273 MW solar plant and a 273 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates