Robert D Willis
Hydro power plant · Jasper County, Texas · not currently in service
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- USACE-Fort Worth District
- County
- Jasper County
- Generating units
- 2
- Share of state capacity
- 0.00%
- Rank among hydro plants in Texas
- #15 of 23
- EIA plant code
- 7200
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 4.0 MW | 4.0 MW | 1989 | Out of service and NOT expected to return to service in next calendar year |
| 2 | Conventional Hydroelectric | 4.0 MW | 4.0 MW | 1989 | Out of service and NOT expected to return to service in next calendar year |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| GE-Lubbock | Wind | 8.7 MW |
| Mexia Solar Project | Solar | 8.0 MW |
| Toyota HQ Plan | Solar | 7.7 MW |
| Seadrift Coke LP | Other | 7.6 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 8.0 MW solar plant and a 8.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates