Home / Power plants / Texas / Second Division Solar

Second Division Solar

Solar power plant · Brazoria County, Texas

Nameplate capacity
100 MW
Rank in Texas
#541
of 1,071 plants
In service since
2024
November 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Lightsource Renewable Energy Asset Management, LLC
County
Brazoria County
Generating units
1
Share of state capacity
0.05%
Rank among solar plants in Texas
#135 of 238
EIA plant code
65981

Generating units

Individual generating units at Second Division Solar
UnitTechnologyNameplateSummerOnlineStatus
TXSD1Solar Photovoltaic100 MW100 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

OCI Alamo 7 LLCSolar100 MW
SJRR (LIG)Natural gas100 MW
Seven Flags BESS LLCBattery storage100 MW
St Gall Energy Storage IIBattery storage100 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 100 MW solar plant and a 100 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates