Nameplate capacity
400 MW
Rank in Texas
#132
of 1,071 plants
In service since
2022
September 2022
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Geronimo Power
- County
- Denton County
- Generating units
- 2
- Share of state capacity
- 0.20%
- Rank among solar plants in Texas
- #19 of 238
- EIA plant code
- 65271
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| NBSLR | Solar Photovoltaic | 275 MW | 275 MW | 2022 | Operating |
| NBSTG | Batteries | 125 MW | 125 MW | 2022 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Bright Arrow Solar, LLC | Solar | 404 MW |
| Sequoia 1 | Solar | 401 MW |
| Waco Solar | Solar | 400 MW |
| ExxonMobil Baytown Turbine | Natural gas | 382 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 400 MW solar plant and a 400 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates