Home / Power plants / Texas / Peregrine Solar

Peregrine Solar

Solar power plant · Goliad County, Texas

Nameplate capacity
300 MW
Rank in Texas
#176
of 1,071 plants
In service since
2025
February 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RWE Clean Energy
County
Goliad County
Generating units
1
Share of state capacity
0.15%
Rank among solar plants in Texas
#32 of 238
EIA plant code
65979

Generating units

Individual generating units at Peregrine Solar
UnitTechnologyNameplateSummerOnlineStatus
PSPVSolar Photovoltaic300 MW300 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

Hubbard WindWind300 MW
PP Jaguar BESS LLCBattery storage300 MW
Prairie Hill Wind ProjectWind300 MW
Prospero SolarSolar300 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 300 MW solar plant and a 300 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates