Blevins Solar & Storage
Solar power plant · Falls County, Texas
Nameplate capacity
450 MW
Rank in Texas
#119
of 1,095 plants
In service since
2025
November 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Geronimo Power
- County
- Falls County
- Generating units
- 3
- Share of state capacity
- 0.22%
- Rank among solar plants in Texas
- #15 of 242
- EIA plant code
- 69414
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| BSBES | Batteries | 180 MW | 180 MW | 2025 | Operating |
| BSLR3 | Solar Photovoltaic | 138 MW | 138 MW | 2026 | Operating |
| BSLR2 | Solar Photovoltaic | 132 MW | 132 MW | 2026 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Texas
| Roadrunner, LLC Hybrid | Solar | 463 MW |
| 2W Permian Solar Project Hybrid | Solar | 460 MW |
| Texas City Power Plant | Natural gas | 450 MW |
| Permian Basin | Natural gas | 447 MW |
About this data
From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 450 MW solar plant and a 450 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates