Solar power plant · Navarro County, Texas

Nameplate capacity
308 MW
Rank in Texas
#159
of 1,071 plants
In service since
2024
September 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Fence Post Solar Project, LLC
County
Navarro County
Generating units
2
Share of state capacity
0.15%
Rank among solar plants in Texas
#27 of 238
EIA plant code
66801

Generating units

Individual generating units at Fence Post Solar Hybrid Project, LLC
UnitTechnologyNameplateSummerOnlineStatus
FNCPTSolar Photovoltaic236 MW236 MW2024Operating
FNCBEBatteries72 MW70 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Texas

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 308 MW solar plant and a 308 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Texas power plants · What Texas actually generates