Power Plants in Georgia
All 267 operable plants · EIA inventory, August 2026.
Capacity by fuel
| Fuel | Capacity | Share | Plants |
|---|---|---|---|
| Natural gas | 18,550 MW | 42.6% | 30 |
| Nuclear | 6,506 MW | 15.0% | 2 |
| Coal | 6,172 MW | 14.2% | 2 |
| Solar | 5,756 MW | 13.2% | 154 |
| Hydro | 3,597 MW | 8.3% | 30 |
| Other | 2,328 MW | 5.4% | 46 |
| Battery storage | 605 MW | 1.4% | 3 |
Nameplate capacity — what the fleet could produce running flat out — not what it actually generated. A plant is filed under the fuel carrying most of its capacity. See what Georgia actually generated →
Largest plants in Georgia
| # | Plant | Fuel | Capacity | Online |
|---|---|---|---|---|
| 1 | VogtleBurke County | Nuclear | 4,658 MW | 1987 |
| 2 | BowenBartow County | Coal | 3,499 MW | 1971 |
| 3 | Jack McDonoughCobb County | Natural gas | 2,848 MW | 1971 |
| 4 | SchererMonroe County | Coal | 2,673 MW | 1982 |
| 5 | Edwin I HatchAppling County | Nuclear | 1,848 MW | 1975 |
| 6 | McIntosh Combined Cycle FacilityEffingham County | Natural gas | 1,377 MW | 2005 |
| 7 | Wansley Combined CycleHeard County | Natural gas | 1,239 MW | 2002 |
| 8 | Thomas A Smith Energy FacilityMurray County | Natural gas | 1,192 MW | 2002 |
| 9 | Tenaska Georgia Generation FacilityHeard County | Natural gas | 1,099 MW | 2001 |
| 10 | DahlbergJackson County | Natural gas | 919 MW | 2000 |
Georgia's generating fleet in context
Georgia's power-plant fleet holds 43.5 GW of nameplate capacity across 267 plants, ranking eighth among the 50 states and DC. This capacity is what the equipment could produce running flat out, not what it actually generated — a megawatt of solar and a megawatt of nuclear appear the same here and produce very different amounts of electricity over a year.
Natural gas dominates the fleet at 42.6% of capacity with 18,550 MW across 30 plants, followed by nuclear at 15% with 6,506 MW in two plants and coal at 14.2% with 6,172 MW in two plants. Solar holds 13.2% of capacity across 154 installations, hydro contributes 8.3% across 30 plants, and battery storage accounts for 1.4%. The largest plants by capacity are Vogtle, a nuclear station with 4,658 MW, Bowen, a coal plant with 3,499 MW, Jack McDonough, a natural-gas facility with 2,848 MW, Scherer, another coal plant with 2,673 MW, and Edwin I Hatch, a nuclear station with 1,848 MW.
The fleet spans more than a century: Morgan Falls, a hydro plant, came online in December 1903, while McGrau Ford Battery Storage Facility began operation in August 2026. The largest plants range from Vogtle's first unit in 1987 to Bowen and Jack McDonough's commissioning in 1971.
Written from the EIA figures on this page, covering data through August 2026.
Every plant in Georgia, by fuel
Natural gas30 plants · 18,550 MW
All US natural gas plants →Nuclear2 plants · 6,506 MW
All US nuclear plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Vogtle | Burke | 4,658 MW | 4 | 1987 |
| Edwin I Hatch | Appling | 1,848 MW | 2 | 1975 |
Coal2 plants · 6,172 MW
All US coal plants →Solar154 plants · 5,756 MW
All US solar plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Wadley Solar | Jefferson | 260 MW | 1 | 2025 |
| Robins Air Force Base Solar | Bibb | 256 MW | 2 | 2021 |
| Cool Springs Solar (Hybrid) | Decatur | 253 MW | 2 | 2021 |
| SR Toombs, LLC | Montgomery | 250 MW | 1 | 2025 |
| Hickory Park Solar Hybrid | Mitchell | 236 MW | 2 | 2022 |
| Twiggs Solar | Twiggs | 204 MW | 1 | 2020 |
| Decatur Solar | Decatur | 200 MW | 1 | 2024 |
| Camilla Solar Energy Project | Mitchell | 171 MW | 1 | 2020 |
| SR DeSoto I, LLC | Lee | 165 MW | 1 | 2022 |
| Quitman II Solar | Brooks | 150 MW | 1 | 2021 |
| Quitman Solar | Brooks | 150 MW | 1 | 2019 |
| Washington County Solar | Washington | 150 MW | 1 | 2024 |
| Taylor County Solar | Taylor | 148 MW | 1 | 2016 |
| Timberland Solar | Oglethorpe | 140 MW | 1 | 2025 |
| Dougherty County Solar, LLC | Dougherty | 120 MW | 1 | 2019 |
| SR Snipesville II | Jeff Davis | 107 MW | 1 | 2021 |
| SR Snipesville III | Jeff Davis | 107 MW | 1 | 2023 |
| SR Clay, LLC | Clay | 106 MW | 1 | 2022 |
| Butler Solar Project 103 | Taylor | 104 MW | 1 | 2016 |
| SR Arlington II | Early | 103 MW | 1 | 2019 |
| White Pine Solar, LLC | Taylor | 101 MW | 1 | 2016 |
| SR Lumpkin | Stewart | 100 MW | 1 | 2021 |
| Moody Air Force Base Solar | Lowndes | 99 MW | 2 | 2020 |
| Snipesville | Jeff Davis | 86 MW | 1 | 2020 |
| Blackwater Solar | Ware | 80 MW | 1 | 2024 |
| Bulldog Solar LLC | Warren | 80 MW | 1 | 2023 |
| CPV Stagecoach Solar | Macon | 80 MW | 1 | 2024 |
| Decatur Parkway Solar Project, LLC | Decatur | 80 MW | 1 | 2015 |
| Lancaster Solar GA | Randolph | 80 MW | 1 | 2021 |
| Pineview Solar, LLC | Wilcox | 80 MW | 1 | 2026 |
| SR Ailey | Montgomery | 80 MW | 1 | 2024 |
| White Oak Solar, LLC | Burke | 77 MW | 1 | 2016 |
| SR Terrell | Terrell | 74 MW | 1 | 2020 |
| Hobnail Solar | Burke | 70 MW | 1 | 2023 |
| SR Cedar Springs, LLC | Early | 70 MW | 1 | 2022 |
| SR Perry | Houston | 68 MW | 1 | 2021 |
| SR DeSoto II | Lee | 65 MW | 1 | 2023 |
| SR DeSoto III | Lee | 60 MW | 1 | 2023 |
| OE_GA3 | Mitchell | 58 MW | 1 | 2020 |
| Hazlehurst II | Jeff Davis | 53 MW | 1 | 2016 |
| Live Oak Solar, LLC | Candler | 51 MW | 1 | 2016 |
| Bird Dog Solar | Burke | 40 MW | 1 | 2023 |
| Hazlehurst III | Jeff Davis | 40 MW | 1 | 2019 |
| Sonny Solar LLC | Elbert | 40 MW | 1 | 2023 |
| Wolfskin Solar | Oglethorpe | 38 MW | 1 | 2024 |
| Marine Corps Logistics Base Solar | Dougherty | 31 MW | 1 | 2018 |
| Pawpaw Solar Plant | Taylor | 31 MW | 1 | 2016 |
| Fort Gordon Solar Facility | Richmond | 30 MW | 1 | 2016 |
| Fort Stewart Solar Facility | Liberty | 30 MW | 1 | 2016 |
| Kings Bay Solar Facility | Camden | 30 MW | 1 | 2016 |
| Simon Solar Farm LLC | Walton | 30 MW | 1 | 2013 |
| Baxley | Appling | 25 MW | 1 | 2020 |
| Butler Solar Farm 20 | Taylor | 22 MW | 1 | 2016 |
| Decatur County Solar Project | Decatur | 20 MW | 1 | 2015 |
| Richland Solar Center | Twiggs | 20 MW | 1 | 2015 |
| SR Arlington I | Early | 20 MW | 1 | 2021 |
| SR Hazlehurst | Jeff Davis | 20 MW | 1 | 2015 |
| SR Odom | Colquitt | 20 MW | 1 | 2020 |
| Old Midville Solar | Jenkins | 20 MW | 1 | 2016 |
| Rincon Solar I | Effingham | 18 MW | 1 | 2016 |
| Solar Glynn | Glynn | 18 MW | 1 | 2016 |
| Camilla Solar Plant | Mitchell | 16 MW | 1 | 2013 |
| Fort Valley State University Solar | Peach | 11 MW | 1 | 2022 |
| McIntosh Solar | Effingham | 10 MW | 1 | 2024 |
| Azalea Solar, LLC | Washington | 7.7 MW | 1 | 2013 |
| Dalton 2 | Murray | 6.5 MW | 1 | 2014 |
| Dublin Solar I | Laurens | 4.1 MW | 1 | 2015 |
| Guyton Community Solar | Effingham | 3.6 MW | 1 | 2019 |
| Solar BESS Hybrid | Cobb | 3.5 MW | 3 | 2020 |
| BE Solar LLC | Decatur | 3.0 MW | 1 | 2022 |
| Bulloch County GA S3 LLC | Bulloch | 3.0 MW | 1 | 2023 |
| Bulloch County GA S4 LLC | Bulloch | 3.0 MW | 1 | 2023 |
| Franklin Milliken | Franklin | 3.0 MW | 1 | 2020 |
| Gordon Thompson | Gordon | 3.0 MW | 1 | 2022 |
| Gratis Road Solar Facility | Walton | 3.0 MW | 1 | 2018 |
| Greene Durham | Greene | 3.0 MW | 1 | 2020 |
| Lowndes Cowart | Lowndes | 3.0 MW | 1 | 2023 |
| Meriwether Jackson | Meriwether | 3.0 MW | 1 | 2020 |
| Murray Treadwell Farms | Murray | 3.0 MW | 1 | 2020 |
| Polk County GA S1, LLC | Polk | 3.0 MW | 1 | 2023 |
| Reidsville Renewables, Inc. | Tattnall | 3.0 MW | 1 | 2023 |
| Richmond County GA S2 LLC | Richmond | 3.0 MW | 1 | 2023 |
| Statesboro Solar LLC | Bulloch | 3.0 MW | 1 | 2022 |
| Tift Fletcher | Tift | 3.0 MW | 1 | 2023 |
| Turnipseed Solar, LLC | Douglas | 3.0 MW | 1 | 2017 |
| Upson County GA S1 LLC | Upson | 3.0 MW | 1 | 2023 |
| Ware Avra I | Ware | 3.0 MW | 1 | 2020 |
| Wilkinson DeFore (Safari Energy) | Wilkinson | 3.0 MW | 1 | 2020 |
| Bulloch Rushing | Bulloch | 2.9 MW | 1 | 2023 |
| Georgia Power at Swainsboro | Emanuel | 2.9 MW | 1 | 2017 |
| Putnam Erikson 2 | Putnam | 2.9 MW | 1 | 2021 |
| Tift Boyd | Tift | 2.9 MW | 1 | 2022 |
| Bulloch Neville Farms | Bulloch | 2.7 MW | 1 | 2020 |
| Putnam Erickson | Putnam | 2.7 MW | 1 | 2020 |
| Bartow Davidson | Bartow | 2.6 MW | 1 | 2023 |
| Coody Cochran | Bleckley | 2.6 MW | 1 | 2019 |
| Rockmart | Polk | 2.6 MW | 1 | 2022 |
| Westberry Jesup | Wayne | 2.6 MW | 1 | 2020 |
| Apalachicola | Richmond | 2.5 MW | 1 | 2019 |
| Pleasant Valley Solar | Walton | 2.5 MW | 1 | 2016 |
| Camp Solar Plant | Meriwether | 2.4 MW | 1 | 2013 |
| Chattooga Gore | Chattooga | 2.4 MW | 1 | 2023 |
| Gordon Pine Hall | Gordon | 2.4 MW | 1 | 2023 |
| Polk Cedartown 2 | Polk | 2.4 MW | 1 | 2023 |
| Waynesboro Community Solar | Burke | 2.4 MW | 1 | 2019 |
| Bibb Williams | Bibb | 2.3 MW | 1 | 2023 |
| Kimberly-Clark Solar | Troup | 2.3 MW | 1 | 2019 |
| Lowndes Tycor Farms | Lowndes | 2.3 MW | 1 | 2020 |
| Richmond Hayes Solar | Richmond | 2.3 MW | 1 | 2018 |
| Troup RC50 | Harris | 2.3 MW | 1 | 2019 |
| Wilkinson DeFore (Westbound) | Wilkinson | 2.3 MW | 1 | 2019 |
| IKEA Savannah 490 | Chatham | 2.2 MW | 2 | 2012 |
| Polk Cedartown | Polk | 2.2 MW | 1 | 2019 |
| Prologis Portside 2509 - SLSAV502 | Chatham | 2.2 MW | 1 | 2026 |
| Fountain Folkston | Charlton | 2.1 MW | 1 | 2019 |
| Harris Shiloh | Harris | 2.1 MW | 1 | 2020 |
| Cairo Solar Farm, LLC | Grady | 2.0 MW | 1 | 2017 |
| Cedar Creek Solar, LLC | Barrow | 2.0 MW | 1 | 2017 |
| Columbia Substation | Columbia | 2.0 MW | 1 | 2020 |
| Comer Solar | Madison | 2.0 MW | 1 | 2018 |
| Shawnee - GA | Burke | 2.0 MW | 1 | 2020 |
| Bryan Floyd | Bryan | 1.9 MW | 1 | 2023 |
| McCleskey Cotton | Terrell | 1.9 MW | 1 | 2019 |
| Pierce Eunice | Pierce | 1.9 MW | 1 | 2023 |
| Telfair Thompson | Telfair | 1.9 MW | 1 | 2018 |
| Tift Bowen | Tift | 1.9 MW | 1 | 2023 |
| Ware Avra II | Ware | 1.9 MW | 1 | 2020 |
| Brady Solar LLC | Sumter | 1.8 MW | 1 | 2023 |
| Lakeland Solar Energy LLC | Lanier | 1.8 MW | 2 | 2013 |
| Arnold Cochran | Bleckley | 1.7 MW | 1 | 2020 |
| Terrell Riles Stovall | Terrell | 1.7 MW | 1 | 2020 |
| Seminole (GA) | Seminole | 1.6 MW | 1 | 2014 |
| Georgia Power at Jakin GA PV | Early | 1.5 MW | 1 | 2017 |
| Lowndes IDA | Lowndes | 1.5 MW | 1 | 2020 |
| Muscogee Public Works | Muscogee | 1.5 MW | 1 | 2019 |
| Troup RC50 II | Troup | 1.5 MW | 1 | 2020 |
| Columbia Bryson | Columbia | 1.4 MW | 1 | 2018 |
| Denver Braswell PV | Colquitt | 1.4 MW | 1 | 2017 |
| Freeman Avenue | Sumter | 1.4 MW | 1 | 2019 |
| Oil Dri 2 Solar | Thomas | 1.4 MW | 1 | 2019 |
| Curry Solar | Tattnall | 1.1 MW | 1 | 2015 |
| Whitfield Cooper | Whitfield | 1.1 MW | 1 | 2022 |
| Atlanta Falcons Solar | Fulton | 1.0 MW | 3 | 2015 |
| Bainbridge Solar | Decatur | 1.0 MW | 1 | 2019 |
| Georgia Power at Wadley GA | Jefferson | 1.0 MW | 1 | 2014 |
| Greenville | Meriwether | 1.0 MW | 1 | 2014 |
| Laredo Bus Facility Solar Canopies | DeKalb | 1.0 MW | 1 | 2012 |
| Mount Vernon Solar | Walton | 1.0 MW | 1 | 2015 |
| Richland (GA) | Stewart | 1.0 MW | 1 | 2014 |
| Tri-County Solar Facility | Putnam | 1.0 MW | 1 | 2016 |
| Valdosta (Terraform) | Lowndes | 1.0 MW | 1 | 2013 |
| Valdosta Prison | Lowndes | 1.0 MW | 1 | 2017 |
| Upson Rocky Creek Solar Plant | Upson | 0.8 MW | 1 | 2012 |
| Hickory Ridge Landfill Solar Project | DeKalb | 0.6 MW | 1 | 2011 |
Hydro30 plants · 3,597 MW
All US hydro plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Rocky Mountain Hydroelectric Plant | Floyd | 848 MW | 3 | 1995 |
| Richard B Russell | Elbert | 628 MW | 8 | 1985 |
| Carters | Murray | 500 MW | 4 | 1975 |
| Hartwell Lake | Hart | 420 MW | 5 | 1962 |
| Wallace Dam | Hancock | 321 MW | 6 | 1979 |
| Walter F George | Clay | 168 MW | 4 | 1963 |
| Buford | Forsyth | 131 MW | 3 | 2003 |
| Allatoona | Bartow | 87 MW | 3 | 1950 |
| West Point (GA) | Troup | 73 MW | 3 | 1975 |
| Tallulah Falls | Habersham | 72 MW | 6 | 1913 |
| Oliver Dam | Muscogee | 60 MW | 4 | 1959 |
| Sinclair Dam | Baldwin | 45 MW | 2 | 1953 |
| Tugalo | Habersham | 45 MW | 4 | 1923 |
| North Highlands | Muscogee | 30 MW | 4 | 1963 |
| Blue Ridge | Fannin | 24 MW | 2 | 1931 |
| Yonah | Stephens | 23 MW | 3 | 1925 |
| Stevens Creek | Columbia | 18 MW | 8 | 1914 |
| Lake Blackshear Project | Worth | 17 MW | 4 | 1930 |
| Morgan Falls | Fulton | 17 MW | 7 | 1903 |
| Terrora | Rabun | 16 MW | 2 | 1925 |
| Nottely | Union | 16 MW | 2 | 1956 |
| Lloyd Shoals | Jasper | 14 MW | 6 | 1911 |
| Burton Dam | Rabun | 6.0 MW | 2 | 1927 |
| Flint River | Dougherty | 5.4 MW | 3 | 1921 |
| Nacoochee | Rabun | 4.8 MW | 2 | 1926 |
| Tallassee Hydro Project | Clarke | 2.3 MW | 2 | 1986 |
| King Mill | Richmond | 2.2 MW | 2 | 1944 |
| Sibley Mill | Richmond | 2.1 MW | 3 | 1946 |
| High Shoals Hydro (GA) | Morgan | 1.4 MW | 1 | 1988 |
| Graniteville Enterprise Division | Richmond | 1.2 MW | 2 | 1921 |
Other46 plants · 2,328 MW
All US other plants →Battery storage3 plants · 605 MW
All US battery storage plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| McGrau Ford Battery Storage Facility | Cherokee | 530 MW | 2 | 2026 |
| Mossy Branch Battery Facility | Talbot | 65 MW | 1 | 2024 |
| Allatoona Substation #10 | Cobb | 10 MW | 1 | 2026 |
Sorted by nameplate capacity within each fuel. “Online” is the year the plant’s earliest surviving unit entered service.