Home / Power plants / Georgia / Butler Solar Project 103

Butler Solar Project 103

Solar power plant · Taylor County, Georgia

Nameplate capacity
104 MW
Rank in Georgia
#59
of 264 plants
In service since
2016
December 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Southern Power Co
County
Taylor County
Generating units
1
Share of state capacity
0.24%
Rank among solar plants in Georgia
#19 of 153
EIA plant code
59896

Generating units

Individual generating units at Butler Solar Project 103
UnitTechnologyNameplateSummerOnlineStatus
1Solar Photovoltaic104 MW100 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Georgia

SR Snipesville IIISolar107 MW
SR Clay, LLCSolar106 MW
SR Arlington IISolar103 MW
White Pine Solar, LLCSolar101 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 104 MW solar plant and a 104 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates