Timberland Solar
Solar power plant · Oglethorpe County, Georgia
Nameplate capacity
140 MW
Rank in Georgia
#52
of 264 plants
In service since
2025
August 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- RWE Clean Energy
- County
- Oglethorpe County
- Generating units
- 1
- Share of state capacity
- 0.33%
- Rank among solar plants in Georgia
- #14 of 153
- EIA plant code
- 65892
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| TSPV | Solar Photovoltaic | 140 MW | 140 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Georgia
| Taylor County Solar | Solar | 148 MW |
| Savannah River Mill | Other | 140 MW |
| Buford | Hydro | 131 MW |
| Baconton Power Plant | Natural gas | 121 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 140 MW solar plant and a 140 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates