GRP Franklin Renewable Energy Facility

Other power plant · Franklin County, Georgia

Nameplate capacity
58 MW
Rank in Georgia
#96
of 264 plants
In service since
2019
December 2019

Details

Primary fuel
Other
Technology
Wood/Wood Waste Biomass
Operator
GRP Franklin Renewable Energy Facility, LLC
County
Franklin County
Generating units
1
Share of state capacity
0.13%
Rank among other plants in Georgia
#16 of 47
EIA plant code
60550

Generating units

Individual generating units at GRP Franklin Renewable Energy Facility
UnitTechnologyNameplateSummerOnlineStatus
GENWood/Wood Waste Biomass58 MW58 MW2019Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Georgia

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 58 MW solar plant and a 58 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates