Prologis Portside 2509 - SLSAV502

Solar power plant · Chatham County, Georgia

Nameplate capacity
2.2 MW
Rank in Georgia
#215
of 267 plants
In service since
2026
June 2026

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Prologis Logistics Services Incorporated
County
Chatham County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in Georgia
#114 of 154
EIA plant code
69436

Generating units

Individual generating units at Prologis Portside 2509 - SLSAV502
UnitTechnologyNameplateSummerOnlineStatus
SA502Solar Photovoltaic2.2 MW2.2 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Georgia

King MillHydro2.2 MW
Polk CedartownSolar2.2 MW
Fountain FolkstonSolar2.1 MW
Harris ShilohSolar2.1 MW

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.2 MW solar plant and a 2.2 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates