Home / Power plants / Georgia / Hickory Park Solar Hybrid

Hickory Park Solar Hybrid

Solar power plant · Mitchell County, Georgia

Nameplate capacity
236 MW
Rank in Georgia
#39
of 264 plants
In service since
2022
June 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RWE Clean Energy
County
Mitchell County
Generating units
2
Share of state capacity
0.55%
Rank among solar plants in Georgia
#5 of 153
EIA plant code
63522

Generating units

Individual generating units at Hickory Park Solar Hybrid
UnitTechnologyNameplateSummerOnlineStatus
HPRKSolar Photovoltaic196 MW196 MW2022Operating
HPBATBatteries40 MW40 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Georgia

SR Toombs, LLCSolar250 MW
Smarr Energy CenterNatural gas242 MW
Twiggs SolarSolar204 MW
Decatur SolarSolar200 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 236 MW solar plant and a 236 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates