Lakeland Solar Energy LLC
Solar power plant · Lanier County, Georgia
Nameplate capacity
1.8 MW
Rank in Georgia
#229
of 264 plants
In service since
2013
December 2013
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Invenergy Services LLC
- County
- Lanier County
- Generating units
- 2
- Share of state capacity
- 0.00%
- Rank among solar plants in Georgia
- #128 of 153
- EIA plant code
- 58572
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | 0.9 MW | 0.9 MW | 2013 | Operating |
| 2 | Solar Photovoltaic | 0.9 MW | 0.9 MW | 2013 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Georgia
| Brady Solar LLC | Solar | 1.8 MW |
| CG PS Portfolio 1, LLC | Other | 1.8 MW |
| Arnold Cochran | Solar | 1.7 MW |
| Terrell Riles Stovall | Solar | 1.7 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.8 MW solar plant and a 1.8 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates