Troup RC50 II

Solar power plant · Troup County, Georgia

Nameplate capacity
1.5 MW
Rank in Georgia
#238
of 264 plants
In service since
2020
April 2020

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Safari Energy, LLC
County
Troup County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in Georgia
#135 of 153
EIA plant code
64284

Generating units

Individual generating units at Troup RC50 II
UnitTechnologyNameplateSummerOnlineStatus
TRC50Solar Photovoltaic1.5 MW1.5 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Georgia

Lowndes IDASolar1.5 MW
Muscogee Public WorksSolar1.5 MW
YKK USA ChestneyOther1.5 MW
Columbia BrysonSolar1.4 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.5 MW solar plant and a 1.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates