Pleasant Valley Solar
Solar power plant · Walton County, Georgia
Nameplate capacity
2.5 MW
Rank in Georgia
#195
of 264 plants
In service since
2016
April 2016
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Walton Electric Member Corp
- County
- Walton County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Georgia
- #100 of 153
- EIA plant code
- 60586
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PV01 | Solar Photovoltaic | 2.5 MW | 2.5 MW | 2016 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Georgia
| Westberry Jesup | Solar | 2.6 MW |
| Apalachicola | Solar | 2.5 MW |
| 191 Peachtree Tower | Other | 2.4 MW |
| Camp Solar Plant | Solar | 2.4 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.5 MW solar plant and a 2.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates