Home / Power plants / Georgia / Pecan Row Landfill To Electric Facility

Pecan Row Landfill To Electric Facility

Other power plant · Lowndes County, Georgia

Nameplate capacity
6.4 MW
Rank in Georgia
#148
of 264 plants
In service since
1977
June 1977

Details

Primary fuel
Other
Technology
Landfill Gas
Operator
Energy Developments, Inc d/b/a EDL
County
Lowndes County
Generating units
4
Share of state capacity
0.01%
Rank among other plants in Georgia
#26 of 47
EIA plant code
59221

Generating units

Individual generating units at Pecan Row Landfill To Electric Facility
UnitTechnologyNameplateSummerOnlineStatus
GEN1Landfill Gas1.6 MW1.6 MW2013Operating
GEN2Landfill Gas1.6 MW1.6 MW2013Operating
GEN3Landfill Gas1.6 MW1.6 MW2013Operating
GM04Landfill Gas1.6 MW1.6 MW1977Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Georgia

MAS ASB Cogen PlantNatural gas6.6 MW
Dalton 2Solar6.5 MW
Superior Landfill Gas RecoveryOther6.4 MW
Burton DamHydro6.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 6.4 MW solar plant and a 6.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates