Bulloch Neville Farms
Solar power plant · Bulloch County, Georgia
Nameplate capacity
2.7 MW
Rank in Georgia
#188
of 264 plants
In service since
2020
May 2020
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Safari Energy, LLC
- County
- Bulloch County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Georgia
- #93 of 153
- EIA plant code
- 64275
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| BNF | Solar Photovoltaic | 2.7 MW | 2.7 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Georgia
| Tift Boyd | Solar | 2.9 MW |
| ADS Renewable Energy-Wolf Creek LLC | Other | 2.8 MW |
| Putnam Erickson | Solar | 2.7 MW |
| Bartow Davidson | Solar | 2.6 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.7 MW solar plant and a 2.7 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates