Old Midville Solar
Solar power plant · Jenkins County, Georgia
Nameplate capacity
20 MW
Rank in Georgia
#126
of 264 plants
In service since
2016
November 2016
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Citizens Enterprises Corporation
- County
- Jenkins County
- Generating units
- 1
- Share of state capacity
- 0.05%
- Rank among solar plants in Georgia
- #59 of 153
- EIA plant code
- 60741
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| OMD | Solar Photovoltaic | 20 MW | 20 MW | 2016 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Georgia
| SR Hazlehurst | Solar | 20 MW |
| SR Odom | Solar | 20 MW |
| Rincon Solar I | Solar | 18 MW |
| Solar Glynn | Solar | 18 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 20 MW solar plant and a 20 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates