SR Snipesville III
Solar power plant · Jeff Davis County, Georgia
Nameplate capacity
107 MW
Rank in Georgia
#57
of 264 plants
In service since
2023
July 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- SR Snipesville III, LLC
- County
- Jeff Davis County
- Generating units
- 1
- Share of state capacity
- 0.25%
- Rank among solar plants in Georgia
- #17 of 153
- EIA plant code
- 66171
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| SNIP3 | Solar Photovoltaic | 107 MW | 107 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Georgia
| Dougherty County Solar, LLC | Solar | 120 MW |
| SR Snipesville II | Solar | 107 MW |
| SR Clay, LLC | Solar | 106 MW |
| Butler Solar Project 103 | Solar | 104 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 107 MW solar plant and a 107 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates