Home / Power plants / Georgia / Tri-County Solar Facility

Tri-County Solar Facility

Solar power plant · Putnam County, Georgia

Nameplate capacity
1.0 MW
Rank in Georgia
#260
of 264 plants
In service since
2016
June 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Georgia Power Co
County
Putnam County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in Georgia
#149 of 153
EIA plant code
60544

Generating units

Individual generating units at Tri-County Solar Facility
UnitTechnologyNameplateSummerOnlineStatus
PV1Solar Photovoltaic1.0 MW1.0 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Georgia

Mount Vernon SolarSolar1.0 MW
Richland (GA)Solar1.0 MW
Valdosta (Terraform)Solar1.0 MW
Valdosta PrisonSolar1.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.0 MW solar plant and a 1.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates