Home / Power plants / Georgia / Edwin I Hatch

Edwin I Hatch

Nuclear power plant · Appling County, Georgia

Nameplate capacity
1,848 MW
Rank in Georgia
#5
of 264 plants
In service since
1975
December 1975

Details

Primary fuel
Nuclear
Technology
Nuclear
Operator
Georgia Power Co
County
Appling County
Generating units
2
Share of state capacity
4.29%
Rank among nuclear plants in Georgia
#2 of 2
EIA plant code
6051

Generating units

Individual generating units at Edwin I Hatch
UnitTechnologyNameplateSummerOnlineStatus
1Nuclear924 MW876 MW1975Operating
2Nuclear924 MW883 MW1979Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Georgia

Jack McDonoughNatural gas2,848 MW
SchererCoal2,673 MW
McIntosh Combined Cycle FacilityNatural gas1,377 MW
Wansley Combined CycleNatural gas1,239 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1,848 MW solar plant and a 1,848 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Georgia power plants · What Georgia actually generates