Home / Power plants / Arizona / Mesquite Solar 1

Mesquite Solar 1

Solar power plant · Maricopa County, Arizona

Nameplate capacity
170 MW
Rank in Arizona
#59
of 200 plants
In service since
2011
November 2011

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
RWE Clean Energy
County
Maricopa County
Generating units
12
Share of state capacity
0.40%
Rank among solar plants in Arizona
#13 of 105
EIA plant code
57707

Generating units

Individual generating units at Mesquite Solar 1
UnitTechnologyNameplateSummerOnlineStatus
1Solar Photovoltaic16 MW16 MW2011Operating
11Solar Photovoltaic16 MW16 MW2012Operating
12Solar Photovoltaic16 MW16 MW2012Operating
2Solar Photovoltaic16 MW16 MW2012Operating
4Solar Photovoltaic16 MW16 MW2012Operating
5Solar Photovoltaic16 MW16 MW2012Operating
7Solar Photovoltaic16 MW16 MW2012Operating
9Solar Photovoltaic16 MW16 MW2012Operating
10Solar Photovoltaic12 MW12 MW2012Operating
8Solar Photovoltaic12 MW12 MW2012Operating
3Solar Photovoltaic10 MW10 MW2011Operating
6Solar Photovoltaic8.0 MW8.0 MW2012Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

SaguaroNatural gas185 MW
White Wing SolarSolar179 MW
Scatter Wash 1Battery storage170 MW
Sun PondSolar170 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 170 MW solar plant and a 170 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates