Home / Power plants / Arizona / Amazon TUS2

Amazon TUS2

Solar power plant · Pima County, Arizona

Nameplate capacity
2.6 MW
Rank in Arizona
#175
of 200 plants
In service since
2022
June 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
SkyHigh 2 Solar
County
Pima County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in Arizona
#81 of 105
EIA plant code
64384

Generating units

Individual generating units at Amazon TUS2
UnitTechnologyNameplateSummerOnlineStatus
ATUS2Solar Photovoltaic2.6 MW2.6 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.6 MW solar plant and a 2.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates