Home / Power plants / Arizona / Central Line Solar, LLC

Central Line Solar, LLC

Solar power plant · Pinal County, Arizona

Nameplate capacity
100 MW
Rank in Arizona
#83
of 200 plants
In service since
2022
April 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
AES Distributed Energy
County
Pinal County
Generating units
1
Share of state capacity
0.23%
Rank among solar plants in Arizona
#26 of 105
EIA plant code
64566

Generating units

Individual generating units at Central Line Solar, LLC
UnitTechnologyNameplateSummerOnlineStatus
CNTRLSolar Photovoltaic100 MW100 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

ValenciaNatural gas108 MW
North LoopNatural gas108 MW
East Line SolarSolar100 MW
Mesquite Solar 2, LLCSolar100 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 100 MW solar plant and a 100 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates