Home / Power plants / Arizona / AZ State University - Tempe Campus Solar

AZ State University - Tempe Campus Solar

Solar power plant · Maricopa County, Arizona

Nameplate capacity
2.5 MW
Rank in Arizona
#176
of 200 plants
In service since
2003
December 2003

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Arizona State University FDM
County
Maricopa County
Generating units
12
Share of state capacity
0.01%
Rank among solar plants in Arizona
#82 of 105
EIA plant code
62643

Generating units

Individual generating units at AZ State University - Tempe Campus Solar
UnitTechnologyNameplateSummerOnlineStatus
3384Solar Photovoltaic0.7 MW0.7 MW2009Operating
3385Solar Photovoltaic0.6 MW0.6 MW2008Operating
20794Solar Photovoltaic0.2 MW0.2 MW2013Operating
20971Solar Photovoltaic0.2 MW0.2 MW2013Operating
20799Solar Photovoltaic0.1 MW0.1 MW2013Out of service but expected to return to service in next calendar year
20974Solar Photovoltaic0.1 MW0.1 MW2013Operating
20975Solar Photovoltaic0.1 MW0.1 MW2003Operating
3365ASolar Photovoltaic0.1 MW0.1 MW2009Out of service but expected to return to service in next calendar year
3365BSolar Photovoltaic0.1 MW0.1 MW2009Out of service but expected to return to service in next calendar year
4202Solar Photovoltaic0.1 MW0.1 MW2009Operating
91001Solar Photovoltaic0.1 MW0.1 MW2018Operating
ISTB7Solar Photovoltaic0.1 MW0.1 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

TJX PhoenixSolar2.9 MW
Amazon TUS2Solar2.6 MW
Amazon GoodyearSolar2.4 MW
Gilbert Solar Facility I, LLCSolar2.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.5 MW solar plant and a 2.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates