Avalon Solar II
Solar power plant · Pima County, Arizona
Nameplate capacity
16 MW
Rank in Arizona
#135
of 200 plants
In service since
2016
March 2016
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Avalon Solar Partners II, LLC
- County
- Pima County
- Generating units
- 1
- Share of state capacity
- 0.04%
- Rank among solar plants in Arizona
- #52 of 105
- EIA plant code
- 60062
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| ASII | Solar Photovoltaic | 16 MW | 16 MW | 2016 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Arizona
| Fort Huachuca Solar PV Project | Solar | 18 MW |
| Arizona State University CHP | Natural gas | 17 MW |
| RE Gillespie 1 LLC | Solar | 15 MW |
| Saddle Mountain Solar I | Solar | 15 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 16 MW solar plant and a 16 MW nuclear plant have the same entry here and produce very different amounts of electricity.