Home / Power plants / Arizona / Intel - Ocotillo Campus Solar

Intel - Ocotillo Campus Solar

Solar power plant · Maricopa County, Arizona

Nameplate capacity
4.2 MW
Rank in Arizona
#164
of 200 plants
In service since
2017
December 2017

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Tesla Inc.
County
Maricopa County
Generating units
2
Share of state capacity
0.01%
Rank among solar plants in Arizona
#74 of 105
EIA plant code
60822

Generating units

Individual generating units at Intel - Ocotillo Campus Solar
UnitTechnologyNameplateSummerOnlineStatus
PV1Solar Photovoltaic2.8 MW2.8 MW2017Operating
PV2Solar Photovoltaic1.4 MW1.4 MW2018Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.2 MW solar plant and a 4.2 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates