Home / Power plants / Arizona / Brittlebush Solar

Brittlebush Solar

Solar power plant · Pinal County, Arizona

Nameplate capacity
200 MW
Rank in Arizona
#51
of 200 plants
In service since
2024
November 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Randolph Solar Park LLC
County
Pinal County
Generating units
1
Share of state capacity
0.47%
Rank among solar plants in Arizona
#11 of 105
EIA plant code
67799

Generating units

Individual generating units at Brittlebush Solar
UnitTechnologyNameplateSummerOnlineStatus
GEN01Solar Photovoltaic200 MW200 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

Chevelon Butte Phase 2Wind216 MW
Storey Solar and StorageSolar210 MW
Flatland StorageBattery storage200 MW
Roadrunner Reserve Phase 1Battery storage200 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 200 MW solar plant and a 200 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates