Brittlebush Solar
Solar power plant · Pinal County, Arizona
Nameplate capacity
200 MW
Rank in Arizona
#51
of 200 plants
In service since
2024
November 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Randolph Solar Park LLC
- County
- Pinal County
- Generating units
- 1
- Share of state capacity
- 0.47%
- Rank among solar plants in Arizona
- #11 of 105
- EIA plant code
- 67799
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | 200 MW | 200 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Arizona
| Chevelon Butte Phase 2 | Wind | 216 MW |
| Storey Solar and Storage | Solar | 210 MW |
| Flatland Storage | Battery storage | 200 MW |
| Roadrunner Reserve Phase 1 | Battery storage | 200 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 200 MW solar plant and a 200 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates