Home / Power plants / Arizona / Apache Solar I

Apache Solar I

Solar power plant · Cochise County, Arizona

Nameplate capacity
40 MW
Rank in Arizona
#110
of 200 plants
In service since
2017
October 2017

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Arizona Electric Pwr Coop Inc
County
Cochise County
Generating units
3
Share of state capacity
0.09%
Rank among solar plants in Arizona
#40 of 105
EIA plant code
60964

Generating units

Individual generating units at Apache Solar I
UnitTechnologyNameplateSummerOnlineStatus
AEPS1Solar Photovoltaic20 MW20 MW2017Operating
AEPB1Batteries10 MW10 MW2024Operating
TRIB1Batteries10 MW10 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

Hyder Solar HybridSolar48 MW
Sandstone SolarSolar45 MW
SR McNealBattery storage40 MW
WaddellHydro40 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 40 MW solar plant and a 40 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates