Agave

Solar power plant · Maricopa County, Arizona

Nameplate capacity
150 MW
Rank in Arizona
#67
of 200 plants
In service since
2023
September 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Arizona Public Service Co
County
Maricopa County
Generating units
1
Share of state capacity
0.35%
Rank among solar plants in Arizona
#18 of 105
EIA plant code
67964

Generating units

Individual generating units at Agave
UnitTechnologyNameplateSummerOnlineStatus
A150MSolar Photovoltaic150 MW150 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 150 MW solar plant and a 150 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates