Home / Power plants / Arizona / Hyder Solar Hybrid

Hyder Solar Hybrid

Solar power plant · Yuma County, Arizona

Nameplate capacity
48 MW
Rank in Arizona
#108
of 200 plants
In service since
2011
November 2011

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Arizona Public Service Co
County
Yuma County
Generating units
3
Share of state capacity
0.11%
Rank among solar plants in Arizona
#38 of 105
EIA plant code
57563

Generating units

Individual generating units at Hyder Solar Hybrid
UnitTechnologyNameplateSummerOnlineStatus
PV1Solar Photovoltaic17 MW17 MW2011Operating
H116MBatteries16 MW16 MW2023Operating
PV2Solar Photovoltaic15 MW14 MW2012Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

El Sol BESSBattery storage50 MW
Kingman Energy StorageBattery storage50 MW
Sandstone SolarSolar45 MW
Apache Solar ISolar40 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 48 MW solar plant and a 48 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates