Home / Power plants / Arizona / El Sol BESS

El Sol BESS

Battery storage power plant · Maricopa County, Arizona

Nameplate capacity
50 MW
Rank in Arizona
#106
of 200 plants
In service since
2023
February 2023

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Invenergy Services LLC
County
Maricopa County
Generating units
1
Share of state capacity
0.12%
Rank among battery storage plants in Arizona
#24 of 35
EIA plant code
62964

Generating units

Individual generating units at El Sol BESS
UnitTechnologyNameplateSummerOnlineStatus
EL50MBatteries50 MW50 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Arizona

Gray Hawk SolarSolar55 MW
Bonnybrooke PVSolar50 MW
Kingman Energy StorageBattery storage50 MW
Hyder Solar HybridSolar48 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 50 MW solar plant and a 50 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates