Red Horse III
Solar power plant · Cochise County, Arizona
Nameplate capacity
30 MW
Rank in Arizona
#120
of 200 plants
In service since
2016
July 2016
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Red Horse III
- County
- Cochise County
- Generating units
- 1
- Share of state capacity
- 0.07%
- Rank among solar plants in Arizona
- #44 of 105
- EIA plant code
- 60285
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| RH3 | Solar Photovoltaic | 30 MW | 30 MW | 2016 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Arizona
| OE_AZ1 | Solar | 33 MW |
| Pinal Central Energy Center Hybrid | Solar | 30 MW |
| Avalon Solar | Solar | 29 MW |
| Hyder II Hybrid | Battery storage | 28 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 30 MW solar plant and a 30 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Arizona power plants · What Arizona actually generates