Home / Power plants / Connecticut

Power Plants in Connecticut

All 186 operable plants · EIA inventory, August 2026.

Total capacity
11 GW
40th largest of the 50 states and DC
Plants
186
184 in service
Largest plant
2,260 MW
Millstone

Capacity by fuel

Connecticut generating capacity by fuel
FuelCapacitySharePlants
Natural gas4,963 MW45.1%48
Other3,104 MW28.2%28
Nuclear2,260 MW20.5%1
Solar501 MW4.6%93
Hydro168 MW1.5%15
Wind5.0 MW0.0%1

Nameplate capacity — what the fleet could produce running flat out — not what it actually generated. A plant is filed under the fuel carrying most of its capacity. See what Connecticut actually generated →

Largest plants in Connecticut

#PlantFuelCapacityOnline
1MillstoneNew London CountyNuclear2,260 MW1975
2CPV Towantic Energy CenterNew Haven CountyNatural gas842 MW2018
3Lake Road Generating PlantWindham CountyNatural gas840 MW2002
4MiddletownMiddlesex CountyOther786 MW1958
5Kleen Energy SystemsMiddlesex CountyNatural gas693 MW2011
6New Haven SteamNew Haven CountyOther642 MW1975
7Milford Power ProjectNew Haven CountyNatural gas578 MW2004
8Bridgeport StationFairfield CountyNatural gas576 MW2019
9Bridgeport Energy ProjectFairfield CountyNatural gas520 MW1998
10Montville StationNew London CountyOther495 MW1954

Connecticut's generating fleet in context

Connecticut's generating fleet holds 11,000 megawatts of nameplate capacity and ranks 40th among the 50 states and DC. This is capacity — what the equipment could produce running flat out — not generation, which differs because a megawatt of solar and a megawatt of nuclear produce very different amounts of electricity over a year. Natural gas dominates the mix at 45.1% of capacity across 48 plants, while other fuels account for 28.2%. Nuclear provides 20.5% from a single station, and solar contributes 4.6% spread across 93 plants. Hydro makes up 1.5% and wind rounds out the fleet at less than 1%.

The five largest plants anchor the fleet. Millstone, the state's nuclear station with 2,260 megawatts across 2 units, first came online in January 1975. CPV Towantic Energy Center, a natural gas facility in New Haven County with 842 megawatts, entered service in 2018. Lake Road Generating Plant, also natural gas and also with three units totalling 840 megawatts, came online in 2002. Middletown, an other-fuel plant with 786 megawatts across 4 units, dates to 1958. Kleen Energy Systems, a natural gas facility with 693 megawatts, followed in 2011. The state's fleet spans from Bulls Bridge, first online in January 1903, to Mansfield Landfill, which entered service in June 2026.

Written from the EIA figures on this page, covering data through August 2026.

Every plant in Connecticut, by fuel

Natural gas48 plants · 4,963 MW

All US natural gas plants →
Natural gas power plants in Connecticut, largest first
PlantCountyCapacityUnitsOnline
CPV Towantic Energy CenterNew Haven842 MW32018
Lake Road Generating PlantWindham840 MW32002
Kleen Energy SystemsMiddlesex693 MW32011
Milford Power ProjectNew Haven578 MW22004
Bridgeport StationFairfield576 MW22019
Bridgeport Energy ProjectFairfield520 MW31998
Wallingford EnergyNew Haven350 MW72001
Waterbury GenerationNew Haven96 MW12009
A L PierceNew Haven84 MW12007
Algonquin Windsor LocksHartford71 MW31990
Pfizer Groton PlantNew London38 MW41952
Kimberly Clark-Unit 1,2,3Litchfield36 MW32008
Pratt & WhitneyHartford26 MW11992
UCONN Cogen FacilityTolland26 MW42006
Bridgeport Fuel Cell, LLCFairfield17 MW12013
Rand Whitney CHP PlantNew London17 MW12005
Foxwoods CoGenNew London16 MW32010
Derby Fuel CellNew Haven14 MW52024
Hartford Hospital CogenerationHartford12 MW31988
Generate Colchester Fuel Cells, LLCNew London10 MW12021
Sikorsky Aircraft CHPFairfield9.9 MW32010
Naval Sub Base New London Fuel CellNew London7.4 MW22022
Subase Microgrid ProjectNew London7.4 MW22022
Bradley Energy CenterHartford5.8 MW42002
Pfizer Groton Fuel CellNew London5.6 MW22016
South Windsor Fuel CellHartford5.0 MW12020
UI RCP Bridgeport SeasideFairfield5.0 MW22015
Frito Lay IncorporatedWindham4.6 MW12009
Fairfield University CHP PlantFairfield4.5 MW12007
Danbury Hospital Cogen PlantFairfield4.3 MW12011
HSCo CHPHartford4.0 MW12009
TRS Fuel CellFairfield3.7 MW12019
CCSU Co-Gen-STBY GenHartford3.6 MW41993
UDR Glastonbury Fuel CellHartford3.4 MW12016
Cellu TissueHartford3.0 MW12009
UI RCP New Haven Fuel CellNew Haven2.8 MW12015
UI RCP Woodbridge FCNew Haven2.8 MW12016
Pepperidge Farm BloomfieldHartford2.6 MW22008
Wesleyan University Cogen 1Middlesex2.4 MW12009
Medtronic - New HavenNew Haven2.3 MW12020
Medtronic - New Haven 2New Haven2.2 MW12020
AmericoldCA - Plainville, CTHartford2.0 MW12023
Yale New Haven - New LondonNew London1.8 MW12022
CCSU Fuel Cell ProjectHartford1.4 MW12012
Trinity College Fuel CellHartford1.4 MW12018
UB Fuel CellFairfield1.4 MW12015
Connecticut CollegeNew London1.2 MW12019
FDX010.0 FedEx Fuel CellMiddlesex1.0 MW12018

Other28 plants · 3,104 MW

All US other plants →
Other power plants in Connecticut, largest first
PlantCountyCapacityUnitsOnline
MiddletownMiddlesex786 MW41958
New Haven SteamNew Haven642 MW41975
Montville StationNew London495 MW41954
GenConn Devon LLCNew Haven242 MW42010
GenConn Middletown LLCMiddlesex242 MW42011
Devon StationNew Haven223 MW51985
Cos CobFairfield115 MW51969
Waterside Power, LLCFairfield70 MW32004
Wheelabrator BridgeportFairfield67 MW11988
Plainfield Renewable Energy LLCWindham43 MW12013
BranfordNew Haven22 MW11967
Franklin DriveLitchfield22 MW11968
TorringtonLitchfield22 MW11967
Covanta Southeastern Connecticut CompanyNew London18 MW11991
Covanta Bristol EnergyHartford16 MW11987
Wheelabrator LisbonNew London15 MW11995
Backus Microgrid ProjectNew London10 MW42014
Fort Hill 1, 2, 3 & 4New London10 MW42010
Stamford HealthFairfield10 MW91984
Bridge Street 1 & 2New London5.2 MW22010
Gary Court 1 & 2New London5.2 MW22010
LNG 1 & 2New London5.2 MW22010
Lebanon Pines 1 & 2New London5.2 MW22010
Water Treatment 1 & 2New London5.2 MW22010
Jewett City 1New London2.6 MW12010
Norwich WWTPNew London2.0 MW12006
New Milford Gas RecoveryLitchfield1.6 MW22008
Stamford Health Tully Health CenterFairfield1.5 MW22002

Nuclear1 plant · 2,260 MW

All US nuclear plants →
Nuclear power plants in Connecticut, largest first
PlantCountyCapacityUnitsOnline
MillstoneNew London2,260 MW21975

Solar93 plants · 501 MW

All US solar plants →
Solar power plants in Connecticut, largest first
PlantCountyCapacityUnitsOnline
Gravel Pit Solar, LLCHartford120 MW22025
Quinebaug SolarWindham49 MW12021
DWW Solar llHartford37 MW12019
Fusion Solar Center LLCNew London20 MW12018
Woods Hill SolarWindham20 MW12018
SR LitchfieldLitchfield20 MW12025
Nutmeg SolarHartford20 MW12020
Wallingford SolarNew Haven16 MW12021
North Stonington Solar Center, LLCNew London15 MW12022
SR North StoningtonNew London12 MW12024
East Windsor Solar OneHartford5.0 MW12021
North Franklin SolarNew London5.0 MW12025
Somers Solar Center, LLCTolland5.0 MW12013
Southington Solar OneHartford4.7 MW12022
CMEEC - Norwich Stott St Solar HybridNew London4.3 MW22016
CMEEC - Polaris Park Solar HybridNew London4.3 MW22017
Antares-GRE 314 East Lyme LLCNew London4.0 MW12014
East WindsorHartford4.0 MW12025
East Windsor Solar TwoHartford4.0 MW12025
Enfield Solar OneHartford4.0 MW12024
Norfolk Landfill Solar ProjectLitchfield4.0 MW12024
Raffia Road Solar ProjectHartford4.0 MW12024
Stafford Solar OneTolland4.0 MW12026
Amazon BDL4Hartford3.9 MW12025
Burlington Solar 1Hartford3.5 MW12022
Brass Mill CenterNew Haven3.4 MW12017
Bristol Solar One, LLCHartford3.0 MW12021
Glastonbury Solar OneHartford3.0 MW12025
Town of Rocky Hill PV CSGHartford3.0 MW32018
Windsor Solar OneHartford3.0 MW12025
Woodstock Solar OneWindham3.0 MW12026
Niagara Bottling - BloomfieldHartford2.8 MW12022
Becton Dickinson Ground & Roof TopLitchfield2.5 MW32018
CMEEC - BozrahNew London2.5 MW12016
Barrow SolarTolland2.0 MW12021
Bilton SolarTolland2.0 MW12023
BunceLitchfield2.0 MW12022
CP East Hampton I & II SolarMiddlesex2.0 MW12021
CTGB Maloney and WebsterTolland2.0 MW12025
CTGB Manson YouthNew Haven2.0 MW12024
Canis Major Solar FarmHartford2.0 MW12016
Dickinson Solar (CT)Windham2.0 MW12020
Ellington - 277 Sadds MillTolland2.0 MW12024
Norcap NorthHartford2.0 MW12017
Norcap SouthHartford2.0 MW12017
Platt HillLitchfield2.0 MW12022
Powder HillHartford2.0 MW12020
Sand RoadLitchfield2.0 MW12021
Stafford MS Ground Mount Community SolarTolland2.0 MW22016
Sydney SolarWindham2.0 MW12020
Torrington Solar One, LLCLitchfield2.0 MW12021
Watertown Solar One, LLCLitchfield2.0 MW12021
CTGB OsbornTolland1.8 MW12024
Mansfield LandfillTolland1.8 MW12026
Barrett Farm Solar - Phase IWindham1.7 MW12017
Emerald Gardens PKI, LLCFairfield1.6 MW22021
North Haven Solar OneNew Haven1.6 MW12024
Dynamic Energy CT STAGNew Haven1.5 MW12023
FedEx MiddletownMiddlesex1.5 MW12024
CMEEC - Rogers Rd SolarNew London1.3 MW12017
ALDI DC 2Hartford1.2 MW12018
New Britain - 142 Deming RdHartford1.2 MW12025
IKEA New Haven Rooftop PV & Fuel CellNew Haven1.1 MW22012
Town of BranfordNew Haven1.1 MW12018
Adams SolarNew London1.0 MW12018
Advance Stores Company, IncHartford1.0 MW12014
Amazon BDL3 Solar ProjectNew Haven1.0 MW12019
Benz Solar 1New Haven1.0 MW12025
Benz Solar 2New Haven1.0 MW12025
Blair SolarTolland1.0 MW12021
CMEEC - Navy NE TridentNew London1.0 MW12017
CP Middletown Solar I LLCMiddlesex1.0 MW12019
CP Middletown Solar II LLCMiddlesex1.0 MW12019
Canis Minor Solar FarmLitchfield1.0 MW12016
Clinton SolarNew London1.0 MW12021
Conn Mun Electric Energy CoopNew London1.0 MW12016
Corbin Russwin Phase 3 BerlinHartford1.0 MW12018
Few SolarTolland1.0 MW12021
Franklin Solar (CT)New London1.0 MW12018
Hamilton SolarNew London1.0 MW12018
Hartford Landfill Solar EGFHartford1.0 MW12014
Jackson Solar (CT)New London1.0 MW12019
Jefferson Solar (CT)New London1.0 MW12018
Madison Solar (CT)Tolland1.0 MW12021
Manchester Community College EastHartford1.0 MW12018
Manchester Community College NorthHartford1.0 MW12018
McHenry SolarWindham1.0 MW12021
Park SolarNew Haven1.0 MW12023
Plainfield Solar 1Windham1.0 MW12020
Plainfield Solar 2Windham1.0 MW12020
Sherman SolarNew London1.0 MW12019
Ticket Network South WindsorHartford1.0 MW12018
Wilson Solar (CT)New London1.0 MW12018

Hydro15 plants · 168 MW

All US hydro plants →
Hydro power plants in Connecticut, largest first
PlantCountyCapacityUnitsOnline
ShepaugNew Haven37 MW11955
Rocky River (CT)Litchfield31 MW31928
StevensonFairfield31 MW41919
TunnelNew London21 MW31919
Falls VillageLitchfield9.0 MW31914
Derby HydroFairfield8.6 MW41989
Rainbow (CT)Hartford8.0 MW21925
Bulls BridgeLitchfield7.2 MW61903
Goodwin HydroelectricHartford3.2 MW21986
Wyre Wynd Hydroelectric ProjectNew London2.8 MW21984
Quinebaug Lower ProjectWindham2.5 MW41990
Kinneytown New OldNew Haven2.3 MW21986
Scotland DamWindham2.0 MW11937
TaftvilleNew London1.6 MW51906
Tenth StreetNew London1.4 MW11967

Wind1 plant · 5.0 MW

All US wind plants →
Wind power plants in Connecticut, largest first
PlantCountyCapacityUnitsOnline
Wind Colebrook SouthLitchfield5.0 MW12015

Sorted by nameplate capacity within each fuel. “Online” is the year the plant’s earliest surviving unit entered service.

Frequently asked questions

›How many power plants are there in Connecticut?
Connecticut has 186 operable power plants with a combined nameplate capacity of 11 GW, the 40th largest generating fleet of the 50 states and DC. 184 of them are currently in service.
›What is the largest power plant in Connecticut?
Millstone in New London County, a nuclear plant with 2,260 MW of capacity across 2 generating units, first online in December 1975.
›What fuel do Connecticut's power plants use?
Natural gas accounts for the largest share of Connecticut's generating capacity — 4,963 MW, or 45.1% of the total, across 48 plants. Other follows at 28.2%, Nuclear follows at 20.5%, Solar follows at 4.6%. Note this is capacity, not generation — what the fleet could produce, not what it did.
›What is the oldest power plant in Connecticut?
Bulls Bridge is the oldest still operable, with its earliest unit entering service in January 1903. The most recent addition is Mansfield Landfill, online since June 2026.