Town of Rocky Hill PV CSG
Solar power plant · Hartford County, Connecticut
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Tesla Inc.
- County
- Hartford County
- Generating units
- 3
- Share of state capacity
- 0.03%
- Rank among solar plants in Connecticut
- #29 of 92
- EIA plant code
- 61541
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2018 | Operating |
| PV2 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2018 | Operating |
| PV3 | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2018 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Connecticut
| Cellu Tissue | Natural gas | 3.0 MW |
| Glastonbury Solar One | Solar | 3.0 MW |
| Windsor Solar One | Solar | 3.0 MW |
| Woodstock Solar One | Solar | 3.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.0 MW solar plant and a 3.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Connecticut power plants · What Connecticut actually generates