Home / Power plants / Connecticut / Subase Microgrid Project

Subase Microgrid Project

Natural gas power plant · New London County, Connecticut

Nameplate capacity
7.4 MW
Rank in Connecticut
#60
of 184 plants
In service since
2022
December 2022

Details

Primary fuel
Natural gas
Technology
Other Natural Gas
Operator
Connecticut Mun Elec Engy Coop
County
New London County
Generating units
2
Share of state capacity
0.07%
Rank among natural gas plants in Connecticut
#23 of 47
EIA plant code
59701

Generating units

Individual generating units at Subase Microgrid Project
UnitTechnologyNameplateSummerOnlineStatus
SFC1Other Natural Gas3.7 MW3.7 MW2022Operating
SFC2Other Natural Gas3.7 MW3.7 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Connecticut

Rainbow (CT)Hydro8.0 MW
Naval Sub Base New London Fuel CellNatural gas7.4 MW
Bulls BridgeHydro7.2 MW
Bradley Energy CenterNatural gas5.8 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 7.4 MW solar plant and a 7.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Connecticut power plants · What Connecticut actually generates