Bilton Solar

Solar power plant · Tolland County, Connecticut

Nameplate capacity
2.0 MW
Rank in Connecticut
#117
of 186 plants
In service since
2023
September 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Ecos Energy LLC
County
Tolland County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Connecticut
#36 of 93
EIA plant code
69447

Generating units

Individual generating units at Bilton Solar
UnitTechnologyNameplateSummerOnlineStatus
BILTSolar Photovoltaic2.0 MW2.0 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Connecticut

AmericoldCA - Plainville, CTNatural gas2.0 MW
Barrow SolarSolar2.0 MW
BunceSolar2.0 MW
CP East Hampton I & II SolarSolar2.0 MW

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.0 MW solar plant and a 2.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Connecticut power plants · What Connecticut actually generates