Home / Power plants / Connecticut / CP East Hampton I & II Solar

CP East Hampton I & II Solar

Solar power plant · Middlesex County, Connecticut

Nameplate capacity
2.0 MW
Rank in Connecticut
#118
of 184 plants
In service since
2021
February 2021

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
NJR Clean Energy Ventures Corporation
County
Middlesex County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Connecticut
#38 of 92
EIA plant code
68327

Generating units

Individual generating units at CP East Hampton I & II Solar
UnitTechnologyNameplateSummerOnlineStatus
EHAMPSolar Photovoltaic2.0 MW2.0 MW2021Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Connecticut

Bilton SolarSolar2.0 MW
BunceSolar2.0 MW
CTGB Maloney and WebsterSolar2.0 MW
CTGB Manson YouthSolar2.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.0 MW solar plant and a 2.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Connecticut power plants · What Connecticut actually generates