Home / Power plants / Connecticut / East Windsor

East Windsor

Solar power plant · Hartford County, Connecticut

Nameplate capacity
4.0 MW
Rank in Connecticut
#82
of 184 plants
In service since
2025
September 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
NJR Clean Energy Ventures Corporation
County
Hartford County
Generating units
1
Share of state capacity
0.04%
Rank among solar plants in Connecticut
#18 of 92
EIA plant code
68674

Generating units

Individual generating units at East Windsor
UnitTechnologyNameplateSummerOnlineStatus
EWNDRSolar Photovoltaic4.0 MW4.0 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Connecticut

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.0 MW solar plant and a 4.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Connecticut power plants · What Connecticut actually generates