Tunnel

Other power plant · New London County, Connecticut

Nameplate capacity
21 MW
Rank in Connecticut
#35
of 184 plants
In service since
1949
January 1949

Details

Primary fuel
Other
Technology
Petroleum Liquids
Operator
FirstLight Power Resources Services LLC
County
New London County
Generating units
3
Share of state capacity
0.19%
Rank among other plants in Connecticut
#14 of 29
EIA plant code
557

Generating units

Individual generating units at Tunnel
UnitTechnologyNameplateSummerOnlineStatus
10Petroleum Liquids19 MW17 MW1969Standby/Backup: available for service but not normally used
1Conventional Hydroelectric1.0 MW0.8 MW2019Operating
2Conventional Hydroelectric1.0 MW0.8 MW1949Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Connecticut

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 21 MW solar plant and a 21 MW nuclear plant have the same entry here and produce very different amounts of electricity.