Home / Power plants / Connecticut / Amazon BDL4

Amazon BDL4

Solar power plant · Hartford County, Connecticut

Nameplate capacity
3.9 MW
Rank in Connecticut
#89
of 184 plants
In service since
2025
January 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Telyon AMZ Windsor LLC
County
Hartford County
Generating units
1
Share of state capacity
0.04%
Rank among solar plants in Connecticut
#24 of 92
EIA plant code
68013

Generating units

Individual generating units at Amazon BDL4
UnitTechnologyNameplateSummerOnlineStatus
BDL4Solar Photovoltaic3.9 MW3.9 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Connecticut

Raffia Road Solar ProjectSolar4.0 MW
Stafford Solar OneSolar4.0 MW
TRS Fuel CellNatural gas3.7 MW
CCSU Co-Gen-STBY GenNatural gas3.6 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.9 MW solar plant and a 3.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Connecticut power plants · What Connecticut actually generates