Ellington - 277 Sadds Mill
Solar power plant · Tolland County, Connecticut
Nameplate capacity
2.0 MW
Rank in Connecticut
#123
of 184 plants
In service since
2024
March 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Onyx Asset Services Group
- County
- Tolland County
- Generating units
- 1
- Share of state capacity
- 0.02%
- Rank among solar plants in Connecticut
- #43 of 92
- EIA plant code
- 67865
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 10634 | Solar Photovoltaic | 2.0 MW | 2.0 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Connecticut
| Canis Major Solar Farm | Solar | 2.0 MW |
| Dickinson Solar (CT) | Solar | 2.0 MW |
| Norcap North | Solar | 2.0 MW |
| Norcap South | Solar | 2.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.0 MW solar plant and a 2.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Connecticut power plants · What Connecticut actually generates