Power Plants in Maryland
All 234 operable plants · EIA inventory, May 2026.
Capacity by fuel
| Fuel | Capacity | Share | Plants |
|---|---|---|---|
| Natural gas | 6,564 MW | 49.4% | 15 |
| Nuclear | 1,850 MW | 13.9% | 1 |
| Other | 1,635 MW | 12.3% | 19 |
| Coal | 1,370 MW | 10.3% | 1 |
| Solar | 1,073 MW | 8.1% | 187 |
| Hydro | 551 MW | 4.1% | 2 |
| Wind | 245 MW | 1.8% | 6 |
| Battery storage | 5.6 MW | 0.0% | 3 |
Nameplate capacity — what the fleet could produce running flat out — not what it actually generated. A plant is filed under the fuel carrying most of its capacity. See what Maryland actually generated →
Largest plants in Maryland
| # | Plant | Fuel | Capacity | Online |
|---|---|---|---|---|
| 1 | Calvert Cliffs Nuclear Power PlantCalvert County | Nuclear | 1,850 MW | 1975 |
| 2 | Chalk Point PowerPrince Georges County | Natural gas | 1,825 MW | 1967 |
| 3 | Brandon ShoresAnne Arundel County | Coal | 1,370 MW | 1984 |
| 4 | Wildcat Point Generation FacilityCecil County | Natural gas | 1,114 MW | 2018 |
| 5 | KeyPrince Georges County | Natural gas | 831 MW | 2018 |
| 6 | Essential Power Rock Springs LLCCecil County | Natural gas | 796 MW | 2003 |
| 7 | CPV St Charles Energy CenterCharles County | Natural gas | 775 MW | 2017 |
| 8 | Herbert A WagnerAnne Arundel County | Other | 774 MW | 1966 |
| 9 | ConowingoHarford County | Hydro | 531 MW | 1928 |
| 10 | PerrymanHarford County | Natural gas | 492 MW | 1972 |
Maryland's generating fleet in context
Maryland's generating fleet holds 13.3 gigawatts of nameplate capacity across 234 plants, ranking 35th among the 51 state-level fleets counting down from the largest. This figure represents what the equipment could produce running flat out, not what it actually generates — a megawatt of solar and a megawatt of nuclear appear identical here but produce very different amounts of electricity over a year.
Natural gas dominates the fleet at 49.4% of capacity with 15 plants, followed by nuclear at 13.9% from a single plant. Coal provides 10.3%, solar 8.1%, and other fuels comprise the remainder, including hydro at 4.1%, wind at 1.8%, and battery storage under 1%. The largest installation is Calvert Cliffs Nuclear Power Plant with 1,850 megawatts, followed by Chalk Point Power at 1,825 megawatts of natural gas capacity. Brandon Shores contributes 1,370 megawatts from coal, while Wildcat Point Generation Facility and Key, both natural gas facilities coming online in 2018, add 1,114 and 831 megawatts respectively.
The fleet spans from Conowingo, first online in March 1928, to TPE MD PR232, which came online in May 2026. This range captures nearly a century of generating equipment, with the oldest continuing to serve alongside the newest additions to the system.
Written from the EIA figures on this page, covering data through May 2026.
Every plant in Maryland, by fuel
Natural gas15 plants · 6,564 MW
All US natural gas plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Chalk Point Power | Prince Georges | 1,825 MW | 8 | 1967 |
| Wildcat Point Generation Facility | Cecil | 1,114 MW | 3 | 2018 |
| Key | Prince Georges | 831 MW | 3 | 2018 |
| Essential Power Rock Springs LLC | Cecil | 796 MW | 4 | 2003 |
| CPV St Charles Energy Center | Charles | 775 MW | 3 | 2017 |
| Perryman | Harford | 492 MW | 5 | 1972 |
| Dickerson Power | Montgomery | 326 MW | 2 | 1992 |
| Brandywine Power Facility | Prince Georges | 289 MW | 3 | 1996 |
| Central Utility Plant at White Oak | Montgomery | 54 MW | 12 | 2003 |
| NIH Cogeneration Facility | Montgomery | 28 MW | 1 | 2018 |
| Domino Sugar Baltimore | Baltimore City | 18 MW | 3 | 1955 |
| APG Combined Heat and Power Plant | Harford | 7.9 MW | 1 | 2016 |
| Eastern Correctional Institute | Somerset | 5.8 MW | 4 | 1987 |
| Inner Harbor East Heating | Baltimore City | 2.1 MW | 1 | 2004 |
| Maryland Bioenergy Center (Jessup) | Howard | 1.1 MW | 1 | 2022 |
Nuclear1 plant · 1,850 MW
All US nuclear plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Calvert Cliffs Nuclear Power Plant | Calvert | 1,850 MW | 2 | 1975 |
Other19 plants · 1,635 MW
All US other plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Herbert A Wagner | Anne Arundel | 774 MW | 2 | 1966 |
| Morgantown Generating Plant | Charles | 260 MW | 4 | 1973 |
| Vienna Operations | Dorchester | 181 MW | 2 | 1968 |
| NRG Chalk Point CT | Prince Georges | 94 MW | 1 | 1990 |
| Philadelphia | Baltimore City | 83 MW | 4 | 1970 |
| Montgomery County Resource Recovery | Montgomery | 68 MW | 1 | 1995 |
| Wheelabrator Baltimore Refuse | Baltimore City | 65 MW | 2 | 1984 |
| Easton 2 | Talbot | 39 MW | 8 | 1978 |
| Easton | Talbot | 31 MW | 9 | 1954 |
| Crisfield | Somerset | 12 MW | 4 | 1968 |
| Berlin | Worcester | 5.6 MW | 3 | 1961 |
| Wicomico | Wicomico | 5.4 MW | 18 | 2007 |
| Brown Station Road Plant II | Prince Georges | 4.0 MW | 4 | 2003 |
| Eastern Landfill Gas LLC | Baltimore | 4.0 MW | 4 | 2006 |
| Millersville LFG | Anne Arundel | 3.2 MW | 2 | 2012 |
| Back River Waste Water Treatment | Baltimore City | 3.0 MW | 3 | 2009 |
| Brown Station Road Plant I | Prince Georges | 2.7 MW | 3 | 1987 |
| Smith Island | Somerset | 1.5 MW | 2 | 1994 |
| Alpha Ridge LFG | Howard | 1.0 MW | 1 | 2012 |
Coal1 plant · 1,370 MW
All US coal plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Brandon Shores | Anne Arundel | 1,370 MW | 2 | 1984 |
Solar187 plants · 1,073 MW
All US solar plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| CPV Backbone Solar | Garrett | 175 MW | 1 | 2025 |
| Great Bay Solar 1 | Somerset | 118 MW | 2 | 2018 |
| Jones Farm Solar | Queen Annes | 64 MW | 1 | 2025 |
| Egypt Road Solar | Dorchester | 51 MW | 1 | 2025 |
| Bluegrass Solar | Queen Annes | 40 MW | 1 | 2022 |
| Fairview Farms | Harford | 30 MW | 1 | 2024 |
| Ripley | Charles | 28 MW | 1 | 2023 |
| Maryland Solar | Washington | 27 MW | 1 | 2013 |
| Fort Detrick Solar PV | Frederick | 22 MW | 2 | 2016 |
| LeGore Bridge Solar Center | Frederick | 20 MW | 1 | 2025 |
| Todd Solar | Dorchester | 20 MW | 1 | 2021 |
| Jade Meadow LLC | Allegany | 20 MW | 1 | 2024 |
| Biggs Ford Solar Center | Frederick | 15 MW | 1 | 2025 |
| Mount Saint Mary's | Frederick | 14 MW | 1 | 2012 |
| Longview Solar | Wicomico | 14 MW | 1 | 2016 |
| Annapolis Solar Park, LLC | Anne Arundel | 12 MW | 1 | 2018 |
| Kieffer Funk | Washington | 12 MW | 1 | 2026 |
| Rockfish Solar LLC | Charles | 10 MW | 1 | 2015 |
| Solar Hagerstown | Washington | 10 MW | 1 | 2020 |
| Wye Mills VNEM CSG | Queen Annes | 10 MW | 1 | 2016 |
| Baker Point | Frederick | 9.0 MW | 1 | 2016 |
| Costen Solar | Worcester | 8.8 MW | 1 | 2024 |
| Union Bridge Solar | Carroll | 8.2 MW | 1 | 2022 |
| Gateway Solar | Worcester | 7.6 MW | 2 | 2019 |
| Blue Star | Kent | 7.5 MW | 1 | 2020 |
| Bomber CSG | Carroll | 6.0 MW | 1 | 2021 |
| Church Hill | Queen Annes | 6.0 MW | 1 | 2016 |
| Spectrum Solar Hybrid | Prince Georges | 5.6 MW | 2 | 2023 |
| Herbert Farm Solar | Charles | 5.5 MW | 1 | 2012 |
| Brookville Smart Bus Depot Microgrid | Montgomery | 5.0 MW | 5 | 2022 |
| Synergen Panorama, LLC CSG | Prince Georges | 5.0 MW | 1 | 2019 |
| Parkton Landfill | Baltimore | 4.7 MW | 1 | 2025 |
| Pinesburg Solar LLC | Washington | 4.3 MW | 1 | 2020 |
| MD - WL Gore - Cherry Hill | Cecil | 4.0 MW | 1 | 2025 |
| NIST Solar | Montgomery | 4.0 MW | 1 | 2018 |
| THD Baltimore DCs - 5829 Project Lion | Baltimore | 3.8 MW | 1 | 2021 |
| CNE at Cambridge MD | Dorchester | 3.2 MW | 1 | 2015 |
| Beech Road (CSG) | Prince Geroges | 3.0 MW | 1 | 2024 |
| UMMS at Pocomoke | Somerset | 2.8 MW | 1 | 2013 |
| Sol Phoenix | Prince Georges | 2.5 MW | 1 | 2020 |
| APG New Chesapeake | Harford | 2.3 MW | 1 | 2018 |
| IKEA Perryville 460 | Cecil | 2.1 MW | 1 | 2013 |
| Archdiocese of Baltimore J | Harford | 2.0 MW | 1 | 2015 |
| Archdiocese of Baltimore L | Harford | 2.0 MW | 1 | 2015 |
| BTC2 Solar (CSG) | Baltimore | 2.0 MW | 1 | 2019 |
| Baltimore City B | Harford | 2.0 MW | 1 | 2015 |
| Baltimore City D | Harford | 2.0 MW | 1 | 2015 |
| Baltimore City F | Harford | 2.0 MW | 1 | 2015 |
| Baltimore City G | Harford | 2.0 MW | 1 | 2015 |
| Bear One | Washington | 2.0 MW | 1 | 2023 |
| Big Spring Solar (CSG) | Washington | 2.0 MW | 1 | 2024 |
| Bluefin Origination 1 | Prince Georges | 2.0 MW | 1 | 2019 |
| Bulldog Solar One, LLC | Prince Georges | 2.0 MW | 1 | 2020 |
| Burns Solar One LLC | Baltimore | 2.0 MW | 1 | 2020 |
| Cabin Creek MD | Dorchester | 2.0 MW | 1 | 2025 |
| Cannonball Solar (CSG) | Frederick | 2.0 MW | 1 | 2024 |
| Cecil County CCVT HS | Cecil | 2.0 MW | 1 | 2015 |
| Chaberton Solar Catherine | Howard | 2.0 MW | 1 | 2024 |
| Chaberton Solar Greyrock | Wicomico | 2.0 MW | 1 | 2025 |
| Chaberton Solar Lime Kiln | Howard | 2.0 MW | 1 | 2025 |
| Chaberton Solar Matterhorn | Baltimore | 2.0 MW | 1 | 2025 |
| Chester Woods Point Solar, LLC CSG | Queen Annes | 2.0 MW | 1 | 2019 |
| City of Bowie | Prince Georges | 2.0 MW | 1 | 2021 |
| City of Havre De Grace C | Harford | 2.0 MW | 1 | 2015 |
| FFP - MD Foxhall | Baltimore | 2.0 MW | 1 | 2023 |
| FedEx Field Solar Facility | Prince Georges | 2.0 MW | 1 | 2011 |
| Frederick County - Landfill | Frederick | 2.0 MW | 1 | 2019 |
| Friendship I | Howard | 2.0 MW | 1 | 2023 |
| Friendship II | Howard | 2.0 MW | 1 | 2023 |
| Gibbons CSG | Worcester | 2.0 MW | 1 | 2019 |
| Hall Property | Prince Georges | 2.0 MW | 1 | 2024 |
| Hostetter Solar One, LLC | Washington | 2.0 MW | 1 | 2020 |
| IKEA College Park 411 | Prince Georges | 2.0 MW | 2 | 2012 |
| KDC Solar CV Animal Control LLC | Howard | 2.0 MW | 1 | 2023 |
| KDC Solar CV Ascend One LLC | Howard | 2.0 MW | 1 | 2023 |
| KDC Solar CV Cedar Lane Park LLC | Howard | 2.0 MW | 1 | 2023 |
| KDC Solar CV Central MD Regional Transit | Howard | 2.0 MW | 1 | 2023 |
| KDC Solar CV O'Donnell Property LLC | Howard | 2.0 MW | 1 | 2023 |
| KDC Solar TC Blandair Park LLC | Howard | 2.0 MW | 1 | 2022 |
| KDC Solar TC George Howard LLC | Howard | 2.0 MW | 1 | 2022 |
| KDC Solar TC Little Patuxent WWTP LLC | Howard | 2.0 MW | 1 | 2022 |
| Lion One | Baltimore | 2.0 MW | 1 | 2024 |
| Livingston Crossing (CSG) | Prince Georges | 2.0 MW | 1 | 2025 |
| MD - CPG - Ten Oaks | Howard | 2.0 MW | 1 | 2024 |
| MD - CS - BGE - PR24 TPE | Prince Georges | 2.0 MW | 1 | 2022 |
| MD - CS - Potomac Edison Co - GA25 TPE ( | Garrett | 2.0 MW | 1 | 2022 |
| MD - CS - Potomac Edison Co - GA29 TPE | Garrett | 2.0 MW | 1 | 2021 |
| MD - PR97 (CSG) | Prince Georges | 2.0 MW | 1 | 2022 |
| MD CDG 001 | Garrett | 2.0 MW | 1 | 2024 |
| MD CDG 002 | Garrett | 2.0 MW | 1 | 2024 |
| MO32 (CSG) | Montgomery | 2.0 MW | 1 | 2022 |
| MO33 CSG | Montgomery | 2.0 MW | 1 | 2022 |
| Meeting House | Cecil | 2.0 MW | 1 | 2023 |
| OER Monarch CSG | Prince Georges | 2.0 MW | 1 | 2021 |
| OER Patuxent CSG | Anne Arundel | 2.0 MW | 1 | 2022 |
| Oaks Landfill - ANEM | Montgomery | 2.0 MW | 1 | 2024 |
| Oaks Landfill CS 1 | Montgomery | 2.0 MW | 1 | 2024 |
| Oaks Landfill CS 2 | Montgomery | 2.0 MW | 1 | 2024 |
| Old Court Rd Solar | Howard | 2.0 MW | 1 | 2019 |
| Parker Place | Wicomico | 2.0 MW | 1 | 2024 |
| Pittman Solar One LLC | Washington | 2.0 MW | 1 | 2020 |
| Queen Anne's County | Queen Annes | 2.0 MW | 1 | 2013 |
| Rockdale | Washington | 2.0 MW | 1 | 2019 |
| Shepherds Mill CSG | Carroll | 2.0 MW | 1 | 2021 |
| Sod Run WTP A | Harford | 2.0 MW | 1 | 2015 |
| Spruce - WCMD - Creek | Washington | 2.0 MW | 1 | 2015 |
| Spruce - WCMD - Resh I | Washington | 2.0 MW | 1 | 2016 |
| Spruce - WCMD - Rubble I | Washington | 2.0 MW | 1 | 2015 |
| Spruce - WCMD - Rubble II | Washington | 2.0 MW | 1 | 2015 |
| TPE MD GA137 | Garrett | 2.0 MW | 1 | 2025 |
| TPE MD GA140 | Garrett | 2.0 MW | 1 | 2025 |
| TPE MD HO93 | Howard | 2.0 MW | 1 | 2025 |
| TPE MD PR232 | Prince Georges | 2.0 MW | 1 | 2026 |
| TPE MD PR270 | Prince Georges | 2.0 MW | 1 | 2026 |
| Ten Oaks | Howard | 2.0 MW | 1 | 2024 |
| UMCES Ground Mount | Dorchester | 2.0 MW | 1 | 2018 |
| UMES (MD) - Princess Anne | Somerset | 2.0 MW | 1 | 2011 |
| Upper Marlboro 1 CSG | Prince Georges | 2.0 MW | 1 | 2019 |
| White CSG | Baltimore | 2.0 MW | 1 | 2020 |
| Wor-Wic Community College - Offsite | Wicomico | 2.0 MW | 1 | 2019 |
| Montgomery County Solar | Montgomery | 1.9 MW | 1 | 2018 |
| P52ES 1755 Henryton Rd Phase 1 LLC CSG | Howard | 1.9 MW | 1 | 2021 |
| P52ES 1755 Henryton Rd Phase 2 LLC | Howard | 1.9 MW | 1 | 2021 |
| Snowden River CSG | Howard | 1.9 MW | 1 | 2021 |
| Timonium Fairgrounds | Baltimore | 1.9 MW | 1 | 2020 |
| WMATA - Cheverly Metro (CSG) | Prince Georges | 1.9 MW | 1 | 2024 |
| Cromwell | Anne Arundel | 1.8 MW | 1 | 2024 |
| FedEx Hagerstown | Washington | 1.8 MW | 1 | 2015 |
| MD BALTIMORE 4851 HOLABIRD AVE | Baltimore | 1.8 MW | 1 | 2025 |
| Macy's MD Joppa Solar Project | Harford | 1.8 MW | 1 | 2016 |
| APG Old Bayside | Harford | 1.7 MW | 1 | 2018 |
| Bd of Educ of Queen Anne's Cnty, Cnty HS | Queen Annes | 1.7 MW | 1 | 2019 |
| Emmitsburg Solar Arrays | Frederick | 1.7 MW | 1 | 2014 |
| WMATA - Naylor Rd. Metro | Prince Georges | 1.7 MW | 1 | 2023 |
| WMATA - S. Ave. Carport (East) (CSG) | Prince Georges | 1.7 MW | 1 | 2023 |
| CCBC-Catonsville | Howard | 1.6 MW | 1 | 2015 |
| Claggett Landing | Prince Georges | 1.6 MW | 1 | 2024 |
| Elkton Solar | Cecil | 1.6 MW | 1 | 2015 |
| Francis Scott Key Mall | Frederick | 1.6 MW | 1 | 2018 |
| GWCC PV Solar Farm | Prince Georges | 1.6 MW | 1 | 2015 |
| Kelso Community Solar I | Baltimore | 1.6 MW | 1 | 2025 |
| THD Baltimore DC - 5830 Project Tiger | Baltimore | 1.6 MW | 1 | 2021 |
| The Clorox Company | Harford | 1.6 MW | 1 | 2016 |
| 7448 Candlewood Road | Anne Arundel | 1.5 MW | 1 | 2020 |
| CPG - Duke 5300A Holabird | Baltimore City | 1.5 MW | 1 | 2022 |
| CPG - Duke 5300B Holabird | Baltimore City | 1.5 MW | 1 | 2022 |
| CPG - Duke 5900 Holabird | Baltimore City | 1.5 MW | 1 | 2022 |
| CPG - Duke 6000 Holabird | Baltimore City | 1.5 MW | 1 | 2022 |
| Chesapeake College | Queen Annes | 1.5 MW | 1 | 2016 |
| First Baptist Church of Glenarden | Prince Georges | 1.5 MW | 1 | 2018 |
| Hollins Ferry CSG | Baltimore City | 1.5 MW | 1 | 2021 |
| MD JESSUP 7950 OCEANO AVE | Howard | 1.5 MW | 1 | 2024 |
| MEBA | Talbot | 1.5 MW | 1 | 2014 |
| Mustang One | Dorchester | 1.5 MW | 1 | 2024 |
| OER Checkerspot | Anne Arundel | 1.5 MW | 1 | 2021 |
| White Marsh Solar | Baltimore | 1.5 MW | 1 | 2020 |
| Airport Commons 7-slbal210 | Anne Arundel | 1.4 MW | 1 | 2025 |
| CCBC Essex | Baltimore | 1.4 MW | 1 | 2015 |
| Havre de Grace II - E at Perryman | Harford | 1.4 MW | 1 | 2016 |
| IGS Solar I - BWI2 | Baltimore | 1.4 MW | 1 | 2017 |
| Kelso Community Solar II | Baltimore | 1.4 MW | 1 | 2025 |
| MNCPPC Randall Farm | Prince Georges | 1.4 MW | 1 | 2020 |
| McCormick & Co. Inc. at Belcamp | Harford | 1.4 MW | 1 | 2010 |
| Montgomery County Correctional Facility | Montgomery | 1.4 MW | 1 | 2017 |
| Amazon Maryland DCA1 | Baltimore | 1.3 MW | 1 | 2019 |
| Bowie State Solar | Prince Georges | 1.3 MW | 1 | 2018 |
| Kirby Road Solar, LLC | Prince Georges | 1.3 MW | 1 | 2021 |
| Chimes West Friendship (Nixon Farms) | Howard | 1.2 MW | 1 | 2014 |
| Garrett County - DPU Treatment Plant | Garrett | 1.2 MW | 1 | 2017 |
| Holly Spring Meadows | Prince Georges | 1.2 MW | 1 | 2023 |
| CES VMT Solar | Washington | 1.1 MW | 1 | 2015 |
| IGS Solar I - BWI5 | Baltimore | 1.1 MW | 1 | 2016 |
| MD - WL Gore - Appleton | Cecil | 1.1 MW | 1 | 2025 |
| Sheriff Road | Prince Georges | 1.1 MW | 1 | 2020 |
| White Marsh Mall | Baltimore | 1.1 MW | 1 | 2015 |
| 6685 Santa Barbara Ct | Howard | 1.0 MW | 1 | 2020 |
| Anne Arundel County Public Schools | Anne Arundel | 1.0 MW | 1 | 2017 |
| Boyd Soccerplex | Montgomery | 1.0 MW | 1 | 2023 |
| Kent County - Worton Complex | Kent | 1.0 MW | 1 | 2012 |
| Kent County-Kennedyville | Kent | 1.0 MW | 1 | 2012 |
| MNCPPC Germantown Solar | Montgomery | 1.0 MW | 1 | 2018 |
| Mason Solar One LLC | Cecil | 1.0 MW | 1 | 2020 |
| Perdue Salisbury Photovoltaic | Wicomico | 1.0 MW | 1 | 2011 |
| Pfeffers | Baltimore | 1.0 MW | 1 | 2016 |
| Presbyterian Senior Living Service | Baltimore | 1.0 MW | 1 | 2013 |
| Rock Hall | Kent | 1.0 MW | 1 | 2012 |
| Town of Chestertown- Chestertown WWTP | Kent | 1.0 MW | 1 | 2015 |
Hydro2 plants · 551 MW
All US hydro plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Conowingo | Harford | 531 MW | 11 | 1928 |
| Deep Creek | Garrett | 20 MW | 2 | 2025 |
Wind6 plants · 245 MW
All US wind plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Criterion | GARRETT | 70 MW | 1 | 2010 |
| Dans Mountain | Allegany | 55 MW | 1 | 2025 |
| Fourmile Ridge | Garrett | 40 MW | 1 | 2014 |
| Roth Rock Wind Farm LLC | Garrett | 40 MW | 1 | 2011 |
| Fair Wind | Garrett | 30 MW | 1 | 2015 |
| Roth Rock North Wind Farm, LLC | Garrett | 10 MW | 1 | 2011 |
Battery storage3 plants · 5.6 MW
All US battery storage plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Fairhaven | Anne Arundel | 2.5 MW | 1 | 2024 |
| Federalsburg Energy Storage 1 LLC | Caroline | 2.0 MW | 2 | 2021 |
| Chesapeake Beach BESS | Calvert | 1.1 MW | 1 | 2023 |
Sorted by nameplate capacity within each fuel. “Online” is the year the plant’s earliest surviving unit entered service.