Home / Power plants / Connecticut / Canis Major Solar Farm

Canis Major Solar Farm

Solar power plant · Hartford County, Connecticut

Nameplate capacity
2.0 MW
Rank in Connecticut
#121
of 184 plants
In service since
2016
December 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
LSE Canis Major LLC
County
Hartford County
Generating units
1
Share of state capacity
0.02%
Rank among solar plants in Connecticut
#41 of 92
EIA plant code
61398

Generating units

Individual generating units at Canis Major Solar Farm
UnitTechnologyNameplateSummerOnlineStatus
S1980Solar Photovoltaic2.0 MW2.0 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Connecticut

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.0 MW solar plant and a 2.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Connecticut power plants · What Connecticut actually generates