Solar Hagerstown
Solar power plant · Washington County, Maryland
Nameplate capacity
10 MW
Rank in Maryland
#50
of 234 plants
In service since
2020
November 2020
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Greenbacker Renewable Energy Corporation
- County
- Washington County
- Generating units
- 1
- Share of state capacity
- 0.08%
- Rank among solar plants in Maryland
- #19 of 187
- EIA plant code
- 62912
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 137 | Solar Photovoltaic | 10 MW | 7.5 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Maryland
| Rockfish Solar LLC | Solar | 10 MW |
| Roth Rock North Wind Farm, LLC | Wind | 10 MW |
| Wye Mills VNEM CSG | Solar | 10 MW |
| Baker Point | Solar | 9.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 10 MW solar plant and a 10 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Maryland power plants · What Maryland actually generates