Power Plants in Arkansas
All 122 operable plants · EIA inventory, May 2026.
Capacity by fuel
| Fuel | Capacity | Share | Plants |
|---|---|---|---|
| Natural gas | 7,202 MW | 37.7% | 18 |
| Coal | 5,487 MW | 28.7% | 5 |
| Solar | 2,779 MW | 14.5% | 67 |
| Nuclear | 1,845 MW | 9.6% | 1 |
| Hydro | 1,351 MW | 7.1% | 19 |
| Other | 287 MW | 1.5% | 7 |
| Wind | 144 MW | 0.8% | 1 |
| Battery storage | 31 MW | 0.2% | 4 |
Nameplate capacity — what the fleet could produce running flat out — not what it actually generated. A plant is filed under the fuel carrying most of its capacity. See what Arkansas actually generated →
Largest plants in Arkansas
| # | Plant | Fuel | Capacity | Online |
|---|---|---|---|---|
| 1 | Union Power StationUnion County | Natural gas | 2,428 MW | 2003 |
| 2 | Arkansas Nuclear OnePope County | Nuclear | 1,845 MW | 1974 |
| 3 | Independence Steam Electric StationIndependence County | Coal | 1,800 MW | 1983 |
| 4 | White BluffJefferson County | Coal | 1,800 MW | 1980 |
| 5 | Magnet CoveHot Spring County | Natural gas | 746 MW | 2005 |
| 6 | Plum Point Energy StationMississippi County | Coal | 720 MW | 2010 |
| 7 | Hot Spring Generating FacilityHot Spring County | Natural gas | 715 MW | 2002 |
| 8 | Dell Power StationMississippi County | Natural gas | 679 MW | 2007 |
| 9 | John W Turk Jr Power PlantHempstead County | Coal | 609 MW | 2012 |
| 10 | Harry L. OswaldPulaski County | Natural gas | 600 MW | 2002 |
Arkansas's generating fleet in context
Arkansas holds 19.1 GW of generating capacity as of May 2026, ranking 28th among the 51 states and territories counted from the largest fleet. This nameplate capacity reflects what the equipment could produce running flat out, not what it actually generated. The state's 122 plants, 121 in service, draw from a diverse mix of sources. Natural gas provides the largest share at 37.7% across 18 plants, followed by coal at 28.7% from 5 plants. Solar accounts for 14.5% of capacity spread across 67 installations, while nuclear contributes 9.6%. Hydro, other sources, wind, and battery storage together make up the remaining 9.6% of the fleet.
The largest plant by far is Union Power Station, a natural gas facility in Union County with 2,428 MW across 12 units that came online in 2003. Arkansas Nuclear One, which began operating in 1974, provides 1,845 MW from two units in Pope County. Two coal plants follow: Independence Steam Electric Station with 1,800 MW from 1983 and White Bluff with the same capacity from 1980. Magnet Cove, a natural gas plant in Hot Spring County, rounds out the top five with 746 MW in three units from 2005.
The state's power plants span more than nine decades. The oldest still in the directory is Carpenter, which first came online in January 1932. The newest is Cherry Valley PV I, a solar installation that entered service in April 2026.
Written from the EIA figures on this page, covering data through May 2026.
Every plant in Arkansas, by fuel
Natural gas18 plants · 7,202 MW
All US natural gas plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Union Power Station | Union | 2,428 MW | 12 | 2003 |
| Magnet Cove | Hot Spring | 746 MW | 3 | 2005 |
| Hot Spring Generating Facility | Hot Spring | 715 MW | 3 | 2002 |
| Dell Power Station | Mississippi | 679 MW | 3 | 2007 |
| Harry L. Oswald | Pulaski | 600 MW | 9 | 2002 |
| Lake Catherine | Hot Spring | 553 MW | 1 | 1970 |
| Harry D Mattison Gas Plant | Washington | 349 MW | 4 | 2007 |
| Thomas Fitzhugh | Franklin | 256 MW | 3 | 1963 |
| Pine Bluff Energy Center | Jefferson | 230 MW | 2 | 2001 |
| Jonesboro City Water & Light Plant | Craighead | 224 MW | 5 | 1999 |
| Fulton (AR) | Hempstead | 155 MW | 1 | 2001 |
| McClellan (AR) | Ouachita | 136 MW | 1 | 1972 |
| Elkins Generating Center | Washington | 66 MW | 3 | 2010 |
| Georgia-Pacific Crossett LLC | Ashley | 25 MW | 1 | 1962 |
| Paragould Reciprocating | Greene | 19 MW | 3 | 2001 |
| Paragould Turbine | Greene | 14 MW | 5 | 1990 |
| UA Central Utility Plant | Washington | 5.6 MW | 1 | 2016 |
| Fourche Creek Wastewater | Pulaski | 1.3 MW | 1 | 2009 |
Coal5 plants · 5,487 MW
All US coal plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Independence Steam Electric Station | Independence | 1,800 MW | 2 | 1983 |
| White Bluff | Jefferson | 1,800 MW | 2 | 1980 |
| Plum Point Energy Station | Mississippi | 720 MW | 1 | 2010 |
| John W Turk Jr Power Plant | Hempstead | 609 MW | 1 | 2012 |
| Flint Creek | Benton | 558 MW | 1 | 1978 |
Solar67 plants · 2,779 MW
All US solar plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Flat Fork Solar | St Francis | 200 MW | 1 | 2025 |
| Forgeview Solar | Mississippi | 200 MW | 1 | 2025 |
| Long Lake Solar, LLC | Phillips | 200 MW | 1 | 2025 |
| Big Cypress Solar, LLC | Crittenden | 180 MW | 1 | 2023 |
| Newport Solar Project | Jackson | 180 MW | 1 | 2023 |
| West Memphis Solar Station | Crittenden | 180 MW | 1 | 2024 |
| Crooked Lake Solar, LLC | Mississippi | 175 MW | 1 | 2024 |
| Driver Solar | Mississippi | 150 MW | 1 | 2024 |
| Cherry Valley PV I | Cross | 135 MW | 1 | 2026 |
| Quartz Solar, LLC | Cross | 135 MW | 1 | 2025 |
| Woodruff County Solar | Woodruff | 122 MW | 1 | 2024 |
| Searcy Solar Hybrid | White | 110 MW | 2 | 2022 |
| Prairie Mist Solar | Ashley | 109 MW | 1 | 2024 |
| Chicot Solar | Chicot | 100 MW | 1 | 2020 |
| Crossett Solar | Ashley | 100 MW | 1 | 2024 |
| Redfield Solar | Grant | 100 MW | 1 | 2026 |
| Walnut Bend Solar Station PV | Lee | 100 MW | 1 | 2024 |
| Happy Solar 1 | White | 95 MW | 1 | 2023 |
| Stuttgart Solar | Arkansas | 81 MW | 1 | 2018 |
| SR Camden | Calhoun | 12 MW | 1 | 2015 |
| City of Clarksville | Johnson | 10 MW | 1 | 2025 |
| Jonesboro CWL Solar Park | Craighead | 10 MW | 1 | 2022 |
| Branch Solar Farm | Franklin | 5.0 MW | 1 | 2021 |
| Hindsville | Madison | 5.0 MW | 1 | 2025 |
| NLRED 5MW | Pulaski | 5.0 MW | 1 | 2024 |
| Scenic Hill Solar III | Johnson | 5.0 MW | 1 | 2017 |
| Veolia (Gum Springs) | Clark | 5.0 MW | 1 | 2024 |
| ADC Varner | Lincoln | 4.9 MW | 1 | 2024 |
| Zeuber | Pulaski | 4.6 MW | 1 | 2023 |
| Fayetteville Public Schools (SWEPCO) | Logan | 4.0 MW | 1 | 2023 |
| LRWRA | Logan | 4.0 MW | 1 | 2023 |
| XNA (NW AR Natnl Airport) | Benton | 3.0 MW | 1 | 2025 |
| Springdale School District | Washington | 2.9 MW | 1 | 2022 |
| White River Medical Center | Jackson | 2.9 MW | 1 | 2023 |
| Searcy Water II | White | 2.8 MW | 1 | 2021 |
| UADA | Howard | 2.8 MW | 1 | 2023 |
| Ozark Solar Park | Washington | 2.4 MW | 1 | 2021 |
| Scenic Hill Solar IV, LLC | Johnson | 2.2 MW | 1 | 2019 |
| ACC | Howard | 2.0 MW | 1 | 2023 |
| NLRED 2MW | Pulaski | 2.0 MW | 1 | 2024 |
| El Dorado AR | Union | 1.8 MW | 1 | 2024 |
| City of Paris Solar | Logan | 1.5 MW | 1 | 2020 |
| Paragould Solar Farm | Greene | 1.5 MW | 1 | 2021 |
| City of Green Forest (Carroll) | Carroll | 1.2 MW | 1 | 2022 |
| Arkansas Valley | Franklin | 1.0 MW | 1 | 2023 |
| Ashley-Chicot Solar | Ashley | 1.0 MW | 1 | 2018 |
| Berryville School District Solar | Carroll | 1.0 MW | 1 | 2018 |
| C&L | Lincoln | 1.0 MW | 1 | 2020 |
| Clay County Electrical Cooperative | Clay | 1.0 MW | 1 | 2020 |
| Crossett SD | Ashley | 1.0 MW | 1 | 2022 |
| Farmers Electric Cooperative | Jackson | 1.0 MW | 1 | 2019 |
| Fayetteville Public Schools (Ozarks) | Washington | 1.0 MW | 1 | 2023 |
| Forrest City- Eldridge Road | St Francis | 1.0 MW | 1 | 2021 |
| Forrest City- Prison Site | St Francis | 1.0 MW | 1 | 2021 |
| Hot Springs 2020 | Garland | 1.0 MW | 1 | 2021 |
| North Arkansas Electric Cooperative | Fulton | 1.0 MW | 1 | 2021 |
| Ozarks Natural Energy Community Solar | Washington | 1.0 MW | 1 | 2016 |
| Petit Jean | Van Buren | 1.0 MW | 1 | 2023 |
| Rich Mountain Electric Cooperative | Polk | 1.0 MW | 1 | 2020 |
| Rivercrest SD | Mississippi | 1.0 MW | 1 | 2022 |
| SAU Tech | Ouachita | 1.0 MW | 1 | 2019 |
| Searcy Water I | White | 1.0 MW | 1 | 2021 |
| South Central Electric Cooperative | Clark | 1.0 MW | 1 | 2019 |
| Southside SD | Pulaski | 1.0 MW | 1 | 2023 |
| Southwest Arkansas Electric | Miller | 1.0 MW | 1 | 2020 |
| Star City School District | Lincoln | 1.0 MW | 1 | 2021 |
| Woodruff Electric Cooperative | St. Francis | 1.0 MW | 1 | 2019 |
Nuclear1 plant · 1,845 MW
All US nuclear plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Arkansas Nuclear One | Pope | 1,845 MW | 2 | 1974 |
Hydro19 plants · 1,351 MW
All US hydro plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Bull Shoals | Marion | 340 MW | 8 | 1952 |
| Dardanelle | Pope | 161 MW | 4 | 1965 |
| Beaver Dam (AR) | Carroll | 112 MW | 2 | 1965 |
| Dam 2 | Desha | 103 MW | 3 | 1999 |
| Ozark | Franklin | 100 MW | 5 | 1972 |
| Greers Ferry Lake | Cleburne | 96 MW | 2 | 1964 |
| Norfork | Baxter | 80 MW | 2 | 1944 |
| Blakely Mountain | Garland | 75 MW | 2 | 1955 |
| Degray | Clark | 70 MW | 2 | 1972 |
| Carpenter | Garland | 56 MW | 2 | 1932 |
| Murray | Pulaski | 45 MW | 2 | 1988 |
| Ellis Hydro | Crawford | 32 MW | 3 | 1988 |
| Whillock | Conway | 32 MW | 3 | 1993 |
| Narrows (AR) | Pike | 26 MW | 3 | 1950 |
| Remmel | Hot Spring | 9.0 MW | 3 | 2025 |
| White River Lock and Dam 1 | Independence | 4.3 MW | 1 | 2007 |
| White River Lock and Dam 3 | Stone | 4.3 MW | 1 | 2006 |
| White River Lock and Dam 2 | Independence | 3.5 MW | 1 | 2007 |
| Lee Creek Water Treatment Facility | Crawford | 1.3 MW | 1 | 1992 |
Other7 plants · 287 MW
All US other plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Ashdown | Little River | 157 MW | 4 | 1968 |
| Pine Bluff Mill | Jefferson | 85 MW | 3 | 1958 |
| Clearwater Paper APP CB | Desha | 28 MW | 1 | 1977 |
| Municipal Light | Clay | 7.2 MW | 5 | 1952 |
| Two Pine Landfill Gas Recovery | Pulaski | 4.8 MW | 6 | 2006 |
| Waste Management Eco Vista LFGTE | Washington | 4.0 MW | 5 | 2010 |
| Osceola (AR) | Mississippi | 1.6 MW | 1 | 1992 |
Wind1 plant · 144 MW
All US wind plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Crossover Wind | Cross | 144 MW | 1 | 2025 |
Battery storage4 plants · 31 MW
All US battery storage plants →| Plant | County | Capacity | Units | Online |
|---|---|---|---|---|
| Noland Wastewater Treatment Plant Hybrid | Washington | 11 MW | 2 | 2019 |
| Westside Wastewater Treatment Plant Hybr | Washington | 11 MW | 2 | 2019 |
| General Dynamics | Ouachita | 7.0 MW | 3 | 2020 |
| Craighead Electric Solar One | Craighead | 2.2 MW | 2 | 2018 |
Sorted by nameplate capacity within each fuel. “Online” is the year the plant’s earliest surviving unit entered service.